The Planning Board shall apply the standards contained in this
article when reviewing subdivision plans.
In the case of all major/minor subdivisions or site plans where
sewer lines which will pass in front of existing lots are to be installed,
the developer, as a condition of approval, shall provide:
A. To vacant property: a wye.
B. To improved property: a lateral to the existing curbline (including
cleanout). These laterals shall be provided in accordance with Borough
details and shall be installed at locations approved by the Borough
Engineer.