The fee for a construction permit shall be the sum of the subcode
fees listed in Subsections A through E hereof and shall be paid before
the permit is issued.
A. The building subcode fees shall be:
(1) For new construction: $0.038 per cubic foot of building or structure
volume, provided that the minimum fee shall be $200.
(2) Exception. Exception to such minimum charge shall apply to small
sheds (over 200 square feet), residential garages not insulated and
other small uninsulated accessory structures on residential properties,
as determined by the Construction Official. The minimum fee shall
be $95.
(3) For renovations, alterations or repairs: $34 per $1,000 for the first
$50,000 of estimated cost. From $50,001 to and including $100,000,
the fee on the amount exceeding $50,000 shall be in the amount of
$26 per $1,000 of estimated cost. Above $100,000, the fee on the amount
exceeding $100,000 shall be in the amount of $22 per $1,000 of estimated
cost. In all cases the minimum fee shall be $90.
(4) For additions: $0.038 per cubic foot of building or structure volume,
provided that the minimum fee shall be $200.
(5) For combinations or renovations and additions: the sum of the fee
computed separately for renovations and for additions.
(6) For construction, addition or alteration of a building (excluding
farmhouses) which is utilized for active commercial farming purposes
and is located on property which is subject to farmland assessment:
$0.006 per cubic foot of building or structure volume, provided that
the minimum fee shall be $90.
(7) Modular and manufactured home installation: fees shall be based upon
estimated cost of work, $40 per $1,000 of cost. ("Work" to be defined
as installation of home, basements, porches, carports, garages.) Minimum
charge of $350. Includes electric, plumbing, and fire hookup cost.
(8) The fee for the construction or installation of an aboveground swimming
pool shall be $100 for a pool with a surface area greater than 550
square feet; the fee in all other cases shall be $75. The fee for
the construction or installation of an inground swimming pool shall
be $300 for a pool with a surface area greater than 550 square feet;
the fee in all other cases shall be $200. For repairs of a swimming
pool: aboveground, $100; in-ground, $200; spa, hot tub, $50.
(9) For construction or installation of any type of an energy producing
windmill: $75.
(10) For installation or replacement of roofing and siding (other than
one- and two-family dwellings): $34 per $1,000 for the first $50,000
of estimated cost. From $50,001 to and including $100,000, the fee
on the amount exceeding $50,000 shall be in the amount of $26 per
$1,000 of estimated cost. Above $100,000, the fee on the amount exceeding
$100,000 shall be in the amount of $22 per $1,000 of estimated cost.
In all cases, the minimum fee shall be $90.
(11) For installation of a fireplace: $75.
(12) For installation of a woodburning stove or chimney flue liner: $75.
(13) For installation or replacement of retaining walls:
(a)
The fee for a retaining wall with a surface area greater than
550 square feet that is associated with a Class 3 residential structure
shall be $150;
(b)
The fee for a retaining wall with a surface area of 550 square
feet or less that is associated with a Class 3 residential structure
shall be $75;
(c)
The fee for a newly constructed retaining wall of any size at
other than a Class 3 residential structure shall be based on the cost
of the construction.
B. The plumbing subcode fees shall be as follows and shall be paid before
inspection is made. For each plumbing application, a minimum fee shall
be $90. Additional fees shall apply to the following devices:
Device
|
Fee
|
---|
Water closet
|
$15
|
Urinal/bidet
|
$15
|
Bathtub
|
$15
|
Lavatory
|
$15
|
Shower
|
$15
|
Floor drains
|
$15
|
Sink
|
$15
|
Dishwasher
|
$15
|
Drinking fountain
|
$15
|
Washing machines
|
$15
|
Hose bib
|
$15
|
Condensate drains
|
$15
|
Water heater
|
$15
|
Steam boiler
|
$91
|
Hot-water boiler
|
$91
|
Sewer pump
|
$91
|
Interceptor/separator
|
$91
|
Backflow device
|
$91
|
Grease trap
|
$91
|
Water-cooled A/C refrigeration unit
|
$91
|
Sewer connection
|
$91
|
Water connection
|
$91
|
L.P. cylinders and piping
|
$91
|
Booster pumps
|
$91
|
Testing of backflow preventers
|
$91
|
Oil piping
|
$65
|
Gas piping
|
$65
|
Lawn sprinkler (backflow preventer)
|
$75
|
Stacks
|
$15
|
Swimming pool entrapment protection
|
$70
|
C. Mechanical subcode fees shall only be applicable to the R-3, R-4
and R-5 Use Groups, and shall be charged as follows:
(1) The fee for the replacement of an individual fuel-fired mechanical
device shall be a minimum fee for the first device of $60, and $30
for each additional device and shall include inspection for required
combustion air.
(2) No separate fee shall be charged for gas, fuel oil, or water piping
connections associated with the mechanical equipment inspection.
(3) A flat fee in the sum of $120 shall be charged for each new or replacement
complete HVAC system installation, consisting of a furnace, compressor,
a-coil, drip pan, condensate pump or discharge line, humidifier, combustion
air, or any combination thereof.
(4) A flat fee in the sum of $100 shall be charged for each new fuel-fired
generator installation.
D. Fire protection subcode. The minimum fee for a permit shall be $90.
Permit fees for fire protection devices shall be as follows:
(1) Sprinkler systems, all types:
(b)
Twenty-one to 100 heads: $168.
(c)
One hundred one to 200 heads: $321.
(d)
Two hundred one to 400 heads: $831.
(e)
Four hundred one to 1,000 heads: $1,150.
(f)
Over 1,000 heads: $1,469.
(2) Standpipes:
(a)
To 50 feet of pipe: $100.
(b)
Fifty-one to 100 feet of pipe: $175.
(c)
One hundred one plus feet of pipe, additional: $50 per 100 feet.
(3) Special suppression systems:
(a)
Carbon dioxide system:
[1]
One to 75 pounds of agent: $60.
[2]
Seventy-six pounds plus: $85.
(b)
Dry chemical or comparable systems, per 50 pounds: $40.
(c)
Halogenated or clean agent systems:
[1]
One to 35 pounds of agent: $60.
[2]
Thirty-six pounds plus: $95.
(d)
Wet chemical suppression systems:
[2]
Twenty-six plus gallons: $95.
(4) Commercial kitchen hood exhaust systems. Fee shall be $65 per unit.
The minimum fee shall be $90.
(5) Fuel-fired equipment, including heat-producing devices, other than
in Use Groups R-3, R-4 and R-5, shall be $30 per $1,000 of estimated
cost of work (material and labor). The minimum fee shall be $90.
(6) Alarms. Smoke detectors, heat detectors, bells, pull stations and
all other sounding devices. The minimum fee shall be $90.
(a)
Fee, Residential R-3, R-4: $5 each unit.
(b)
All other groups:
Number of Detectors
|
Fee
|
---|
1 to 20
|
$75
|
21 to 200
|
$100
|
201 to 400
|
$150
|
400 plus
|
$50 addition
|
(7) Flammable/combustible tanks. Residential: $40. All other uses $10
per $1,000 costs. The minimum fee shall be $90.
E. The electrical subcode inspection fee shall be as follows and shall
be paid before inspection is made. For each electrical application,
a minimum fee shall be $90.
(1) Wiring and fixtures. All switches, receptacles and lighting outlets,
detectors F.H.P. motors, emergency and exits, etc., to be counted
as outlets.
(b)
For each additional 25 outlets or fraction (increments of 25):
$15.
(2) Vapor lamps and mogul sockets 300 watts and over:
(a)
Interior or exterior wall or ceiling mounted:
(b)
Exterior lights standards, etc.:
[1]
Poles one to five (two inspections required): $65.
(3) Swimming pools:
(a)
Aboveground and spas: $100.
(b)
In-ground (three inspections required): $200.
(c)
Electric pool heaters: $45.
(d)
Installation and fees for any items not listed, minimum fee:
$90.
(e)
Water softeners, water fountains, spa hot tubs, hydromassage,
bathtubs, therapeutic pools: $50.
(4) Residential electric ranges, hot-water heaters, welders, clothes
dryers and similar devices:
(a)
For each outlet for single unit of 20 KW or less: $35.
(b)
Each additional unit: $12.
(c)
Dishwashers, garbage disposal and trash compactors: $12.
(5) Heat pumps, air handlers, air-conditioning compressor/condenser,
and furnaces: $35; each additional one, $12.
(6) Paddle fans: fixture schedule in Subsection
E(1).
(7) Bath fans: fixture schedule in Subsection
E(1).
(9) Electric baseboard:
(b)
Each additional unit (per baseboard): $8.
(c)
Oil or gas furnaces, residential: $12.
(10) Motor-driven equipment: apply Motor Schedule.
(11) Motors:
Horsepower or Kilowatt
|
Fee
|
---|
1 to 10 HP or KW, each
|
$45
|
11 to 30 HP or KW, each
|
$60
|
31 to 45 HP
|
$80
|
46 to 100 HP
|
$300
|
101 HP and up
|
$500
|
(12) Motor control centers:
Amperes
|
Fee
|
---|
0 to 100
|
$45
|
101 to 400
|
$90
|
401 to 600
|
$125
|
601 to 1,000
|
$250
|
1,001 to 2,000
|
$350
|
2,001 and up
|
$450
|
(13) Feeders (relocated, replacement, added to or original equipment):
apply service equipment schedule.
(14) Service and meter equipment and subpanels (relocated, replacement,
added to, or original equipment installations):
Amperes
|
Fee
|
---|
0 to 100
|
$50
|
101 to 200
|
$60
|
201 to 400
|
$175
|
401 to 600
|
$275
|
601 to 1,000
|
$475
|
1,000 and up
|
$625
|
(15) Capacitors:
(b)
Each additional unit: $5.
(c)
Group capacitors: change as per motor schedule. Note: Motors
equipped with capacitors during original installation, no charge.
(16) Transformers vaults - outdoors - enclosures, generators, outdoor
substations:
Kilowatt or Kilovolt Ampere
|
Fee
|
---|
1 to 10 KW (KVA)
|
$45
|
11 to 30 KW (KVA)
|
$55
|
31 to 45 KW (KVA)
|
$85
|
46 to 100 KW (KVA)
|
$275
|
101 and up KW (KVA)
|
$550
|
(17) The fee for a permit to construct an electric sign, billboard, etc.,
shall be as follows:
(a)
Fees for pylon signs shall be $4 per square foot for the first
100 square feet, $3 per square foot for the next 400 square feet and
$2 per square foot thereafter;
(b)
Fees for ground signs or wall signs shall be $2 per square foot
for the first 100 square feet, $1.50 per square foot for the next
400 square feet and $1 per square foot thereafter;
(c)
The minimum fee shall be $90.
(18) Annual inspection of public swimming pools, spas and hot tubs as
required under N.J.A.C. 5:23-4.18(1): $100.
(19) Protective signaling devices:
(a)
Fire alarm system, burglar alarm system: $25.
(b)
Smoke detector for R-3, each: $3.
(c)
Smoke detector for commercial uses and industrial uses, each:
$3.
(20) Commercial refrigeration, etc., walk-in units: apply motor schedule:
(a)
Display and storage units, each: $40.
(21) Electrical power and controls for life support equipment:
(a)
Emergency backup power: apply motor and generator schedule.
(b)
Controls: apply panel schedule.
(c)
All others: apply fire subcode schedule.
F. The fees for permits, certificates, special and miscellaneous service
not hereinbefore provided for shall be as follows and shall be paid
before the permit or certificate is issued and before the service
is performed:
(1) For a permit for demolition of a one-family or two-family residence:
$100.
(2) For a permit for demolition of a shed or garage: $75.
(3) For a permit for demolition of any other building or structure not provided for by Subsection
F(1) or
(2) set forth above: $200.
(4) For a permit for a tank removal for a residential structure: $75.
All other use groups up to 2,000 gallons: $100.
(5) For a permit for removal of a building or structure from one lot to another or to a new location on the same lot shall be the sum of all the subcode fees for new construction listed in §
41-2A,
B and
C of this chapter and shall be paid before the permit is issued.
(6) A permit shall be required for all signs: $40 up to $500 costs and
$75 over $500 costs. However, no permit is required for a freestanding,
ground surface sign supported by uprights or braces, not served by
electricity, and not having dimensions in excess of 25 square feet
in surface area and not more than six feet above the ground (mounted
height).
(7) For a certificate of occupancy for a newly constructed building or
structure, the fee shall be 5% of the total fees, provided that the
minimum shall be $25.
(8) The fee for a certificate of continued occupancy (no change of occupancy
or use, however, improvements were conducted without a permit obtained
by previous owner) shall be as follows:
(a)
In excess of 300 square feet: $200.
(b)
Up to 300 square feet: $100.
(9) The fee for a reinspection (must be conducted within 60 days of initial
inspection) for a commercial or industrial structure is as follows:
(a)
In excess of 300 square feet: $100.
(b)
Up to 300 square feet: $50.
(10) The fee for a reinspection (must be conducted within 60 days of initial
inspection) for a residential structure is $50.
(11) The fee for reinstatement of a lapsed permit shall be 20% of the
cost of the original permit or $25, whichever is greater.
(12) The fee for first issuance and the renewal of a temporary certificate
of occupancy shall be $30. Exception: There shall be no fee for the
first issuance of the temporary certificate of occupancy, provided
that the certificate of occupancy fee is paid at that time.
(13) Asbestos. An administrative fee of $70 for each construction permit
issued for an asbestos hazard abatement project.
(a)
An administrative fee of $14 for each certificate of occupancy
issued following the successful completion of an asbestos hazard abatement
project.
(14) The fee for plan review of new construction, including additions
and major alterations, shall be 20% of the construction permit amount,
which shall be credited on the amount of the fee charged for the construction
permit. The plan review fee shall not be refundable.
(15) For plans already reviewed, those plans processed as prototype, there
will be a discount of 10% of the construction permit fee. Said prototype
plan approvals shall be valid for the purpose of applying for the
construction permit until six months after the adoption of the addition
of the code as set forth in N.J.A.C. 5:23-1.6(b). When submitting
under prototype plan review, the Construction Code Office must be
informed prior to plan review.
(16) Code variation. A fee of $50 shall be charged for an application
for a variation to the code.
(17) Ongoing inspection. State guidelines as published in UCC of N.J.A.C.
5:23 et seq.
(18) Elevator. As established by N.J.A.C. 5:23 et seq.
(19) If fee is not listed for specific items, the Construction Official
and appropriate subcode official will set the fee.
(20) In order for the training certification and technical support program
required by the Uniform Construction Code Act, the regulations, the enforcing agency shall collect, in
addition to the fees specified above, a surcharge fee as specified
in N.J.A.C. 5:23 et seq. Said surcharge fee shall be remitted to the
Department of Community Affairs Enforcing Office on a quarterly basis.
(21) Photovoltaic solar panel systems:
(a)
Electrical flat fee, each: $200 for under 10KW; over 10KW: $300;
over 20KW to 30KW: $400. See solar fees.
(b)
Building flat fee, each: $200.
(c)
System greater than 100 kilowatts shall be building flat fee:
$400.
(d)
System greater than 100 kilowatts shall be electrical flat fee:
$400.
(e)
Solar farms priced as per fixtures.
(22) Any item not listed herein. $75.
The Construction Official shall, with the advice of the subcode
officials, prepare and submit to the Borough Council biannually a
report recommending a fee schedule based on the operating expenses
of the agency, and any other expenses of the municipality fairly attributable
to the enforcement of the State Uniform Construction Code Act.
In order to provide for the training, certification, and technical
support programs required by the Uniform Construction Code Act and
the regulations, the enforcing agency shall collect, in addition to
the fees specified above, a surcharge fee of $0.0006 per cubic foot
of volume of new construction. Said surcharge fee shall be remitted
to the Bureau of Housing Inspection, Department of Community Affairs,
on a quarterly basis for the fiscal quarter ending September 30, December
31, March 31, and June 30, and not later than one month next succeeding
the end of the quarter for which it is due. In the fiscal year in
which the regulations first become effective, said fee shall be collected
and remitted for the third and fourth quarters only.
The enforcing agency shall report annually at the end of each
fiscal year to the Bureau of Housing Inspection, and not later than
July 31, the total amount of the surcharge fee collected in the fiscal
year. In the fiscal year in which the regulations first become effective,
said report shall be for the third and fourth quarters only.