[Adopted 1-24-1996 (Sec.
20107 of the 1996 Code)]
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. III)]
Within six months, or as determined by site plan review, as
applicable, after work or any excavation for a building has begun,
such excavation shall be covered over or refilled by the owner to
the normal grade. Any building substantially destroyed from any cause
or rendered incapable of its intended use shall be rebuilt or demolished
within six months. Any excavation or cellar hole remaining after the
demolition or destruction of a building from any cause or any abandoned
well shall be immediately protected by visible, substantial, childproof
barriers and then permanently covered over or filled by the owner
within 30 days. In the case of a natural disaster, i.e., fire, the
time limit of this section may be waived at the discretion of the
Board of Trustees.
[Amended 4-10-2014 by L.L. No. 3-2014]
Failure to comply with any of the provisions of this article
shall be deemed a violation and the violator shall be punished as
set forth on the Village of Dryden Fine Schedule, which Fine Schedule
may be established by resolution and thereafter amended from time
to time by resolution of the Village Board of Trustees.