Type of Fee
|
Amount
| |
---|---|---|
Property tax
[Amended 6-9-1997 by Ord. No. 97-1; 6-11-2001 by Ord. No. 01-4; 7-10-2006 by Ord. No. A06-3 | ||
Per $100
[Amended 5-28-2014 by Ord. No. 14-4; 11-19-2018 by Ord. No. 18-3] |
Fiscal Year 2020: $2.52
Fiscal Year 2021: $2.64
Fiscal Year 2022: $2.76
Fiscal Year 2023: $2.88
Fiscal Year 2024: $3
Fiscal Year 2025 and thereafter: $3
| |
Penalty
|
2% per month after due date
| |
Garbage collection fee, per month
[Added 7-13-2009 by Ord. No. A09-8] |
$14
| |
Water rates:
[Amended 6-11-2001 by Ord. No. 01-4; 7-1-2004; 6-2-2008 by Ord. No.
A08-7; 5-28-2014 by Ord. No. 14-3; 10-13-2014 by Ord. No. 14-7; 3-9-2015 by Ord. No. 15-3; 8-8-2022 by Ord. No. 22-03] | ||
Water service fee
| ||
3/4" meter (standard residential)
|
$15 per month
| |
3/4" meter - secondary (irrigation, etc.)
|
$10 per month
| |
1" meter
|
$18.75 per month
| |
2" meter
|
$33.75 per month
| |
3" meter
|
$48.75 per month
| |
4" meter
|
$63.75 per month
| |
*Meter service fee is calculated as a multiplier of the standard
3/4" fee. Any additional meter size not included in this list shall
follow the same formula.
Fee: ((Meter size - base meter size) (base meter rate)) + (base
meter rate)
Ex. for 4" meter: ((4 - 3/4) (15) + 15) => ((3.25 x 15) + 15)
=> (48.75+15) = $63.75.
| ||
Water usage fee
| ||
0 to 5,000 gallons
|
$3.76 per thousand gallons per month
| |
Next 5,000 gallons
|
$4.32 per thousand gallons per month
| |
All over 10,000 gallons
|
$3.76 per thousand gallons per month
| |
Fire lines:
| ||
10-inch meter
|
$1,500 per year
| |
8-inch meter
|
$1,200 per year
| |
6-inch meter
|
$1,000 per year
| |
4-inch and below
|
$500 per year
| |
Sewer rates:
[Amended 6-11-2001 by Ord. No. 01-4; 6-2-2008 by Ord. No.
A08-7] | ||
0 to 2,500 gallons
|
$24 per month
| |
2,500 to 5,000 gallons
|
$7.10 per thousand gallons per month
| |
Next 5,000 gallons
|
$8.50 per thousand gallons per month
| |
All over 10,000 gallons
|
$13 per thousand gallons per month
| |
Nonmetered customers
[Added 2-10-2014 by Ord. No. 14-1] |
$60 per EDU minimum monthly charge
| |
Sewer charges are based on the number of gallons
of water used.
| ||
Infill residential impact fees:
[Amended 6-11-2001 by Ord. No. 01-4; 6-14-2004 by Ord. No.
A04-5; 5-12-2008 by Ord. No. A08-3] | ||
Minimum charge for sewer
|
$1,080
| |
Minimum charge for water
|
$750
| |
For single-meter pit
|
$500
| |
For dual-meter pit
|
$625
| |
Apartments or townhouses:
[Added 6-11-2001 by Ord. No. 01-4] | ||
Per bedroom for sewer
|
$360
| |
Per bedroom for water
|
$250
| |
Non-infill residential impact fees:
[Added 5-12-2008 by Ord. No. A08-3] | ||
Minimum charge for sewer per EDU or every fraction
thereof
[Amended 10-14-2013 by Ord. No. 13-9] |
$6,000
| |
Minimum charge for water per EDU or every fraction
thereof
[Amended 10-14-2013 by Ord. No. 13-9] |
$500
| |
For single-meter pit
|
$500
| |
For dual-meter pit
|
$625
| |
An “infill lot” is an existing,
undeveloped lot of record within the existing corporate limits of
Bridgeville as of October 19, 2002. Each infill lot shall be entitled
to one EDU at the infill residential impact fee rate as may be amended
from time to time by the Commissioners.
[Added 5-12-2008 by Ord. No. A08-3] | ||
Plumber makes tap and pays cost of running line
into house.
| ||
Sewer inspection fee
|
$50
| |
Reconnect fees for water
|
$25 for nonpayment
| |
For service calls on water after first call
|
$25 each call
|
Monthly Charges for Stormwater Runoff
to Sewer System
| ||
---|---|---|
Type
|
Amount
| |
Roof connection to sewer lines
|
$10 per month
| |
Catch basins in yard
|
$100 basin per month
|
Schedule of Charges and Fees
of the Community Sewer of the Town of
Bridgeville
|
Sewage flow per year in gallons + (Production
Days x 200 gal/day/EDU).
|
Flow Data for Commercial, Institutional
or Industrial Structures
| |||
---|---|---|---|
Type of Structure
|
Number of EDUs
| ||
Motel or hotel room without kitchen and with
bath
|
0.30
| ||
Boardinghouse/dormitory room
|
0.45
| ||
Gas station with public restrooms
| |||
Per first service bay
|
0.35
| ||
Each additional gas station service bay in excess
of 1
|
1.0
| ||
Retail store 0.12 GPD per SF
|
1.0
| ||
Laundromat 225 GPD per washer
|
4.0 minimum
| ||
Professional office units 0.2 GPD per SF
|
1.0 minimum
| ||
Medical office units 0.35 GPD per SF
|
1.0 minimum
| ||
County government and state government offices
0.25 GPD per SF
|
1.0 minimum building
| ||
Barbershop
|
1.0
| ||
Beauty shop
| |||
Two chairs or fewer
|
2.0
| ||
Each additional chair
|
0.5
| ||
Manufacturing business or industry (excluding
process wastewater)
| |||
10 or fewer employees
|
1.0
| ||
Each additional five employees or fraction thereof
|
0.5
| ||
Supermarkets, 0.2 GPD per SF
|
2.0 minimum
| ||
Church with attached or detached facilities,
0.10 GPD per SF
|
1.0 minimum
| ||
Nongovernmental public meeting hall or lodge
0.10 GPD per SF
|
1.0 minimum
| ||
Fast-food restaurant 1.0 GPD per SF
|
5.0 minimum
| ||
Restaurants, clubs, taverns 25 GPD per seat
[Amended 10-14-2002 by Ord. No. 2-00] |
1.0 minimum
| ||
School, public or private with toilet facilities,
kitchen, gym and showers 25 GPD per full-time pupil or staff member;
10 GPD per part-time pupil or staff member
|
10.0 minimum
| ||
Correctional facilities, 150 GPD per bed, plus
50 GPD per staff member
|
1.0 minimum
| ||
Theater, 5 GPD per seat
|
1.0 minimum
|
NOTE: 200 GPD = 1 EDU
[Amended 10-14-2002 by Ord. No. 2-00] |
Town of Bridgeville General Charges and
Fees
[Amended 6-11-2001 by Ord. No. 01-4; 6-9-2003 by Ord. No.
A03-5; 2-9-2004 by Ord. No. A04-1; 3-13-2006 by Ord.No.
A06-2; 4-9-2007 by Ord. No. A07-1; 11-10-2008 by Ord. No. A08-9; 8-11-2008 by Ord. No. A08-10] | |||
---|---|---|---|
Type of Fee
|
Amount
| ||
Variance, zoning and conditional use hearings
|
$500*
| ||
Copies of public records
| |||
Per page for documents
|
$0.25
| ||
Minimum charge
|
$1
| ||
Fax transmissions, local
| |||
First page
|
$2
| ||
Additional pages
|
$1
| ||
Building permit fees
|
1% of construction cost
| ||
In addition to existing building permit fees,
the building permit fee shall also include a fee of 1 1/2% based on
the cost of construction or the projected selling price of the residential
property, whichever is greater. This fee shall be collected if settlement
involves only the price of the lot.
| |||
Notary fees, per signature
|
$2
| ||
Peddler's permit, for a calendar year
|
$50
| ||
Annexation application fee
|
$1,500
| ||
*NOTE: This fee covers Town staff and supplies. Applicants shall
be responsible for all costs associated with their request, including,
but not limited, to costs such as advertising, legal fees, engineering
fees, etc.
|