The power to approve site plans has been delegated to the Planning Board by the Village Board.
[Amended 7-19-2010 by L.L. No. 4-2010]
Site plan review by the Village of Rouses Point Planning Board shall be required for all new construction except one- or two-family dwellings or any residential accessory structures.
The purpose of this article is to specify uses for which approval is required and the elements to be included in such plan review.
Elements to consider in site plan review include:
A. 
Parking.
B. 
Means of access.
C. 
Screening.
D. 
Signs.
E. 
Landscaping.
F. 
Architect.
G. 
Dimensions and location of building.
H. 
Impact of proposed use on adjacent land use.
I. 
Such other as may be related to: health, safety and general welfare.
A. 
Site plan specifies the present characteristics of a particular parcel and its surroundings and describes intended activities and their potential impact on the community.
B. 
Functions:
(1) 
Illustrate intended design, arrangement and uses of the land to be improved.
(2) 
Describe the proposal's physical, social and economic effect on the community.
C. 
Construction shall be defined as the enlarging, expanding and/or increasing the size of the footprint of an existing building or the making of any exterior structural changes to a building which would require the issuance of a building permit under the New York State Building Code.
[Added 7-19-2010 by L.L. No. 4-2010]
Submission requirements are as follows:
A. 
Legal data:
(1) 
Name and address of applicant and authorization of owner if different from applicant.
(2) 
Name and address of owner(s) of record, if different from applicant.
(3) 
Name and address of person or firm preparing the plan and map.
(4) 
Ownership intentions, such as purchased options.
(5) 
Current zoning classifications of property, including exact zoning boundary if in more than one district.
(6) 
Property boundary line plotted to scale. Distance, angles and area should be shown.
(7) 
North arrow, scale and date.
(8) 
Locations, width and purpose of all existing and proposed easements, setbacks, reservations and areas dedicated to public use within and adjoining the property.
(9) 
Property lines and names of owners of adjoining parcels.
(10) 
Description of all existing deed restrictions or covenants applying to the property.
(11) 
Record of the application and approval status of all necessary state and county permits (final only).
B. 
Another element, necessary to determine conformity with the intent of the regulations, is the identification of any state or county permits required for execution of the project.
Site plan review shall address the impact of the proposal on the environs, including:
A. 
Relationship to adjacent and nearby land uses, both public and private.
B. 
Relationship to existing and proposed traffic patterns.
C. 
Relationship to existing and projected water supply, sewage disposal and similar service capabilities.
D. 
Relationship to the community's ability to provide adequate recreation, education, fire protection and similar facilities and services to its residents.
E. 
Visual compatibility with surroundings.
F. 
Effect on air and water quality standards applicable primarily to industrial site development plans.
G. 
Effect on energy consumption and conservation. A draft environmental impact statement (DEIS) and environmental impact statement (EIS) will be required if the reviewing agency deems the proposal to be significant pursuant to the State Environmental Quality Review Act (SEQRA).
Site plan review shall address natural features:
A. 
Geological features, such as depth to bedrock and location of rock outcrops.
B. 
Topographical features, including a map showing existing contour intervals of no more than five feet. Two-foot contour levels should be required if the topography is relatively flat. Areas of steep slopes should be delineated as necessary.
C. 
Vegetative cover, including existing wooded areas, significant isolated trees and similar features.
D. 
Soil characteristics, such as load-bearing capacity and drainage capacity.
E. 
Hydrologic features should include drainage and run-off patterns, flood hazard area, wetlands and depth to groundwater.
Site plan review shall address existing development and infrastructure:
A. 
Location and dimension of major buildings and structures.
B. 
Location and width of roads and paths, including site access.
C. 
Location, size and flow direction of sewers, water supply lines and culverts. Major electric, gas and telephone lines and appurtenances should also be shown.
D. 
Location of other existing development land uses, including parking and loading areas, fences, trees and landscaping.
Site plan review shall address the proposed development:
A. 
Grading and drainage plan showing proposed topography at appropriate contour intervals. This information can be combined with the map of existing topography if it can be clearly duplicated.
B. 
Location, proposed use and heights of buildings and other structures such as retaining walls, fences, outdoor storage tanks, air-conditioning units and waste disposal units.
C. 
Location, proposed use, design and construction materials of improvements not requiring structures, such as parking, loading and outdoor storage areas.
D. 
Location and arrangement of site access and egress, including all paths for pedestrian and vehicular travel within the site. Information should include profiles and cross-sections of roadways and sidewalks, showing grades, widths and location and size of utility lines.
E. 
Location and size of water and sewer lines and appurtenances. Any means of water supply or sewage disposal, other than extensions of existing systems, should be described, including location, design and construction materials.
F. 
Location, design and construction materials of all energy-distribution facilities, including electric, gas and solar energy.
G. 
Location, size and design of all outdoor lighting facilities and public address systems.
H. 
Location, size, design and construction materials of all outdoor signs.
I. 
General landscaping plan and planting schedule, including the treatment of buffer areas and the location and types of trees to be planted.
J. 
Estimated project construction schedule with possible phasing plan for large projects (final only).
K. 
Additional specifications for materials.
L. 
Performance bond, amount, completion schedule, public improvements covered, inspection and bond approval.
See Attachment A for consideration to determine action.[1]
[1]
Editor's Note: Attachment A is included at the end of this chapter.