The requirements of this chapter shall be enforced by the Construction
Official, who shall inspect or require adequate inspection of the work. The
Construction Official may seek assistance from the Borough Engineer or the
Morris County Soil Conservation District in carrying out any provisions of
this chapter.
The Construction Official shall be notified by the applicant at least
24 hours prior to the start of any project.
Inspections may be made at any time during construction, and the applicant
shall at all times keep a copy of the certified plan at the construction site.
No approval for occupancy of any building shall be granted unless all
needed soil erosion and sediment control measures have been completed in accordance
with this chapter. A formal report of such compliance must be filed with the
municipal officer authorized to issue certificates of occupancy. A copy of
this report shall be sent to the Morris County Soil Conservation District.
The applicant shall bear the final responsibility for the installation
and construction of all required soil erosion and sediment control measures.