The fees required by this chapter are the Borough
of Waynesboro review fees. The Borough of Waynesboro review fee shall
be established by resolution by the Borough Council of the Borough
of Waynesboro to defray any inspection review costs incurred by the
Borough of Waynesboro and the Director of Engineering. All fees shall
be paid by the applicant. Permits to begin any work on any project
shall not be issued until the required fees have been paid.
The fees required by this chapter shall, at
a minimum, cover:
A. The review of the drainage plan by the Director of
Engineering.
C. The inspection of stormwater facilities and drainage
improvements during construction.
D. The final inspection upon completion of the stormwater
management facilities and drainage improvements presented in the drainage
plan.
E. Any additional work required to enforce any permit
provisions regulated by this chapter, correct violations, and assure
proper completion of stipulated remedial actions.