[Ord. No. 1380 § 1, 7-20-1987; Ord. No. 1682 § 1, 7-20-1992; Ord.
No. 1842 § 1, 3-20-1995; Ord. No. 2041 § 1, 11-16-1998; Ord. No. 2462 § 1, 6-18-2007; Ord. No. 2677 § 1, 4-16-2012; Ord. No. 2767 § 1, 6-16-2014; Ord. No. 2944, 3-19-2018]
A certain document, one (1) copy of which is on file in the office of the City Clerk of the City of Centralia, Missouri, being marked and designated as the “International Building Code — 2015 Edition,” as published by the International Code Council, Inc., be and is hereby adopted as the Building Code of the City of Centralia, Missouri, for the control of buildings and structures as provided herein; and each and all of the regulations, provisions, penalties, conditions and terms of such “International Building Code — 2015 Edition,” published by the International Code Council, Inc., on file in the office of the City Clerk of the City of Centralia, Missouri, are hereby referred to, adopted and made a part hereof as if fully set out in this Chapter, with the additions, insertions, deletions and changes as hereinafter prescribed in Section
5-26 and Section
5-27.
[Ord. No. 1380 § 1, 7-20-1987; Ord. No. 1682 § 2, 7-20-1992; Ord.
No. 1842 § 2, 3-20-1995; Ord. No. 2041 § 2, 11-16-1998; Ord. No. 2462 § 1, 6-18-2007; Ord. No. 2677 § 1, 4-16-2012; Ord. No. 2767 § 1, 6-16-2014; Ord. No. 2944, 3-19-2018]
A. Whenever (name of jurisdiction) appears in this code, it shall read
"City of Centralia, Missouri."
B. Whenever "Department of Building Safety" appears in this code, it
shall read "Department of Resource Management of Boone County, Missouri."
C. Wherever "Chief Appointing Authority of the Jurisdiction" appears
in this code, it shall read "Mayor of the City of Centralia, Missouri,
with the advice and consent of a majority of the members of the Board
of Aldermen of the City of Centralia, Missouri."
D. Whenever "Board of Appeals" appears in this code it shall read "Boone
County Building Code Commission."
E. Farm Structure Exemption. The provisions of this code shall not be
exercised so as to impose regulations or to require permits with respect
to the erection, maintenance, repair, alternation, or extension of
farm buildings or farm structures further than seventy-five (75) feet
from a dwelling, provided that such buildings or structures are located
on tracts of twenty (20) acres or more and such buildings or structures
are used exclusively for agricultural purposes. Farm dwellings shall
conform to the provisions of this code as herein provided.
F. Manufactured Home Exemption. Manufactured homes, recreational vehicles
or modular units which carry a seal as provided in Section 700.010
to Section 700.115, RSMo., shall be exempt from these provisions,
provided that no alteration of the unit takes place once it has been
placed upon a tract of land.
G. Portable Building Exemption. Portable buildings as defined by Section 202.0 shall be exempt from these provisions. Portable buildings must comply with all setback requirements found in the zoning regulations in Chapter
31 of the Centralia City Code. Portable buildings used to house hazardous materials (paint, gasoline, etc.) must be placed at least ten (10) feet from any property line and have a door that can be secured by a lock.
[Ord. No. 1380 § 1, 7-20-1987; Ord. No. 1486 § 1, 6-19-1989; Ord.
No. 1589 § 1, 12-17-1990; Ord. No. 1682 § 2, 7-20-1992; Ord.
No. 1842 § 3, 3-20-1995; Ord. No. 1963 § 1, 6-16-1997; Ord.
No. 2041 § 3, 11-16-1998; Ord. No. 2198 § 1, 5-20-2002; Ord.
No. 2346 § 1, 5-16-2005; Ord. No. 2462 § 1, 6-18-2007; Ord.
No. 2677 § 1, 4-16-2012; Ord. No. 2713 § 1, 1-21-2013; Ord.
No. 2767 § 1, 6-16-2014; Ord. No. 2944, 3-19-2018]
The International Building Code — 2015 Edition is amended
by additions, deletions, and changes including the changing of Articles,
Sections, Subsections, Subsection Titles, and the addition of new
Sections and new Subsections, to read as follows:
1. Section 101.2 Add:
Exception 2: Existing buildings undergoing repair, alterations,
or additions and change of occupancy shall be permitted to comply
with the requirements of the International Existing Building Code.
2. Section 101.2.2 Appendices C, E, F, and I are hereby adopted as published,
Appendix J is hereby adopted as amended.
Appendix J, Section J106.1 Maximum slope, is hereby amended
to read as: The slope of cut and fill surfaces shall be no steeper
than is safe for the intended use, and shall be no steeper than three
(3) horizontal to one (1) vertical thirty-three percent (33%) unless
the applicant furnishes a geotechnical report justifying a steeper
slop.
Exceptions: Number 1 is deleted in its entirety and exception
number 2 will now be listed as exception number 1.
Appendix J, Section J107.6 Maximum slope, is hereby amended
to read as: The slope of fill surfaces shall be no steeper than is
safe for the intended use. Fill slopes steeper than three (3) horizontal
to one (1) vertical thirty-three percent (33%) shall be justified
by a geotechnical report or engineering data.
3. Section 101.4 Reference codes: Add the following additional sentence
to this paragraph: All references to the International Existing Building
Codes are deleted.
4. Section 101.4.3 Plumbing. Change last sentence to: The provisions
of the Columbia/Boone County Health Department, the City Code of the
City of Centralia, Missouri, or the Missouri Department of Natural
Resources shall apply to the disposal and/or treatment of sewage originating
from any building constructed according to this code.
5. Section 101.4.4 Property maintenance. Delete.
6. Section 101.4.6 Energy. Delete.
7. Section 103 is retitled to read:
Section 103. Resource Management Department.
8. Section 103.1 Delete in its entirety and add:
Section 103.1 Enforcement Agency. The Resource Management Department
previously created by the Boone County Commission is the enforcement
agency for this code. The Director of Resource Management shall be
known as the Building Official. The Building Official is hereby authorized
and directed to administer and enforce all provisions of this code.
9. Section 103.2 Delete in its entirety and add:
Section 103.2 Appointment. The Director of Resource Management
shall be appointed by the Boone County Commission.
10. Section 103.3 Delete in its entirety and add:
Section 103.3 Deputies. In accordance with the prescribed procedures
of Boone County and with the concurrence of the Boone County Commission,
the Director of Resource Management shall have the authority to appoint
a Deputy Building Official, any related technical officers, inspectors,
plan examiners and other employees. Such employees shall have the
powers as delegated by the Building Official.
11. Section 104.6 Delete in its entirety and add:
Section 104.6 Right of entry. The Code Official shall have the
authority to enter at any reasonable time any structure or premises
for which a permit has been issued but has not received a certificate
of occupancy in accordance with Sections 110.0 and 111.0. Permit holders
are required to provide means of access to all parts of structures
subject to inspection, including the provision of ladders where required.
For all other structures or premises, when the Code Official
has reasonable cause to believe that a code violation exists, the
Code Official is authorized to enter the structure or premises at
reasonable times to inspect subject to constitutional restrictions
on unreasonable searches and seizures. If entry is refused or not
obtained, the Code Official is authorized to pursue recourse as provided
by law.
12. Section 104.7 Delete in its entirety and add:
Section 104.7 Department Records. An official record shall be
kept of all business and activities of the department specified in
the provisions of this code, and all such records shall be open to
public inspection at all appropriate times and according to reasonable
rules to maintain the integrity and security of such records.
13. Section 105.8 Add:
Section 105.8 Compliance With Other Regulatory Agency Fire And
Life Safety Codes. No permit shall be issued unless the plans and
specifications or other required documentation for permit issuance
has been approved by the City of Centralia or other Boone County regulatory
agencies having jurisdiction for compliance with applicable Fire and
Life Safety Codes. These provisions shall not apply to one- and two-family
dwellings or residences.
14. Section 105.9 Add:
Section 105.9 Compliance With Other Regulatory Agency Fire And
Life Safety Codes. No final inspection or periodic inspection made
at the conclusion of a building phase shall be passed or approved
unless similar inspections for compliance with applicable Fire and
Life Safety Codes have been made and approved or passed by the City
of Centralia or other Boone County regulatory agencies having jurisdiction.
These provisions shall not apply to one- and two-family dwellings
or residences.
15. Section 107.1 Delete in its entirety and add:
Section 107.1 Submitted documents. Construction documents, special
inspection and structural observation programs, and other data shall
be submitted in one (1) or more sets with each application for a permit.
The construction documents shall be prepared by a registered design
professional where required by Chapter 327, RSMo. The construction
documents shall be drawn to scale with sufficient clarity and detail
dimensions to show the nature and character of the work to be performed
including general construction, special inspections, construction
observation programs, structural, mechanical and electrical work and
calculations. Each sheet of each set of plans, each set of specifications,
calculations and other data shall be legally sealed by a registered
design professional as required by Chapter 327, RSMo. Where special
conditions exist, the Building Official is authorized to require additional
construction documents to be prepared by a registered design professional.
Buildings or structures exempt from these requirements are:
|
a.
|
One-family dwellings.
|
b.
|
Two-family dwellings.
|
c.
|
A commercial or industrial building or structure buildings having
less than one thousand two hundred (1,200) square feet of floor area
which provides for the employment, assembly, housing, sleeping or
eating of less than ten (10) persons.
|
d.
|
Any one (1) structure containing less than twenty thousand (20,000)
cubic feet, except as provided in (b) and (c) above, and which is
not a part or a portion of a project which contains more than one
(1) structure.
|
16. Section 107.2.5 Delete in its entirety and add:
Section 107.2.5 Site plan. There shall also be a site plan showing
to scale the size and location of all new construction and all existing
structures on the site; distances from lot lines; the established
street grades and the proposed finished grades. It shall be drawn
in accordance with an accurate boundary line survey and certifying
as to the date the survey was made. In the case of demolition the
site plan shall show all construction to be demolished and the location
and size of all existing structures and construction that are to remain
on the site or plot.
17. Section 109.2 Delete in its entirety and add:
Section 109.2 Fee Schedule. A fee for each building permit and
inspection shall be paid in accordance with the schedule approved
by the Enforcement Agency as of the adoption of this ordinance. Subsequent
changes to the fees shall be approved by the Centralia Board of Aldermen
by resolution.
For any gas or HVAC installation, connection, change or upgrade
requiring an inspection — a forty dollar ($40.00) one-time fee
for residential structures and a fifty dollar ($50.00) one-time fee
for commercial structures.
For any electric installation, connection, change or upgrade
requiring an inspection — a forty dollar ($40.00) one-time fee.
Provided, however, fees shall not be required for the following:
Fees shall not be required for permits for small portable sheds not
requiring an inspection.
For a fence, no charge if requested prior to construction. Fences
built prior to obtaining a building permit, shall be charged a fee
of twenty-five dollars ($25.00). Any application for a building permit
to build a fence shall be deemed approved if it meets all requirements,
the owner calls to request an inspection of setbacks and no inspection
is made within two (2) business days.
In addition to the fees listed above, any permit requiring a
Building Plan Review shall have a fee not to exceed three hundred
dollars ($300.00).
For any construction performed without first obtaining a required
permit, the permit fee shall be twice what would have otherwise been
applicable.
18. Section 109.6 Delete in its entirety and add:
Section 109.6 Refunds. In the case of the revocation of a permit
or abandonment or discontinuance of a building project, the portion
of the work actually completed shall be computed and any excess fee
for the incomplete work shall be returned to the permit holder upon
written request. All plan examination and permit processing fees and
all penalties that have been imposed on the permit holder under the
requirements of this code shall first be collected. The Code Official
shall authorize the refunding of fees according to City of Centralia
policies under the following additional circumstances:
a. The full amount of any fee paid hereunder which was erroneously paid
or collected.
b. When no work has been done, the permit fee, less a processing fee
of twenty dollars ($20.00), may be refunded to the original permittee.
The Code Official shall not authorize the refunding of any fee
paid, except upon written application filed by the original permittee
not later than one hundred eighty (180) days after the fee was paid.
|
19. Section 113.1 Add: Board Of Appeals. In order to hear and decide
appeals of orders, decisions or determinations made by the Building
Official relative to the application and interpretation of this code,
there shall be and there is hereby created a Board of Appeals. The
Board of Appeals shall consist of the Building Code Commission as
appointed by the Boone County Commission in accordance with Section
64.180, RSMo.
20. Section 113.4 Add:
Section 113.4 Court review. Any party before the Board of Appeals
who is aggrieved by a decision of the Board of Appeals may seek redress
or relief before a court of competent jurisdiction as permitted by
law.
21. Section 114.4 Delete in its entirety and add:
Section 114.4 Violation Penalties. Any person who shall violate
a provision of this code or shall fail to comply with any of the requirements
thereof or who shall erect, construct, alter or repair a building
or structure in violation of an approved plan or directive of the
Building Official or of a permit or certificate issued under the provisions
of the code, shall be guilty of an ordinance violation and upon conviction,
shall be punished by a fine of from one dollar ($1.00) to not more
than five hundred dollars ($500.00). Each day that a violation continues
shall be deemed a separate offense.
22. Section 115.3 Delete in its entirety and add:
Section 115.3 Unlawful continuance. Any person who shall continue
any work in or about the structure after having been served with a
stop work order, except such work as that person is directed to perform
to remove a violation or unsafe conditions, shall be guilty of an
ordinance violation and upon conviction, shall be punished by a fine
of from one dollar ($1.00) to not more than five hundred dollars ($500.00).
Each day that a violation continues shall be deemed a separate offense.
23. Section 116 Delete in its entirety.
24. Section 202.0 Add:
Portable building — a structure constructed off-site and transported to the property by means of a truck or trailer; or one built from a pre-manufactured kit and placed on skids. Portable buildings may enclose no more than one hundred sixty (160) square feet of floor space, and not have interior finish, electrical service or plumbing fixtures. Portable buildings must comply with all setback requirements found in the zoning regulations of Chapter
31 of the Centralia City Code. Portable buildings used to house hazardous materials (paint, gasoline, etc.) must be placed at least ten (10) feet from any property line and have a door than can be secured by a lock.
25. Section 305.2.3 Ten (10) Or Fewer Children In A Dwelling Unit. A
facility such as those described above within a dwelling unit and
having ten (10) unrelated children receiving such day care shall be
classified by as a R-3 occupancy and shall comply with the International
Residential Code.
26. Section 308.6.4 Ten (10) Or Fewer Persons Receiving Care Within In
A Dwelling Unit. A facility such as those described above within a
dwelling unit and having ten (10) unrelated persons receiving custodial
care shall be classified by as an R-3 occupancy and shall comply with
the International Residential Code.
27. Section 903.2.1.2 Delete Item 2 and add:
2. The fire area has an occupant load of two hundred (200) or
more; or
28. Section 915.1 Delete in its entirety and add:
Section 915.1 General. Emergency Responder radio coverage shall
be provided in all new high rise buildings, and other buildings specifically
required by the authority having jurisdiction based on known substantiated
problems associated with radio coverage, in accordance with Section
510 of the International Fire Code.
29. Section 1103.2.3 Floor-Level Exit Signs. Where require, illuminated
signs in A1, A2 over five thousand (5,000) square feet or greater
than two hundred (200) occupants, and R-1 use groups above exit doors
and to the side of exit doors eighteen (18) inches from the floor.
The floor level exit signs shall be protected by a guard to prevent
physical damage. This amendment shall not be retroactive in nature,
and shall not apply to structures prior to January 1, 2007.
30. Section 1301.1.1 Delete in its entirety. Add:
Section 1301.1.1 Criteria. Building shall be designed and constructed
in accordance with the 2009 International Energy Conservation Code
(IECC) with the following amendments to the 2009 IECC:
C101.4 Delete this Section in its entirety.
31. Section 1301.1.2 Add:
Use group R-2, R-3, and R-4 shall comply with this Section or
the requirements of International Energy Conservation Code. All buildings
of Use Group R-2, R-3, and R-4 shall be insulated in accordance with
the following:
|
•
|
Ceiling or roof — R-38.
|
•
|
Exterior wall — R-15 for the assembly.
|
•
|
Floor above unheated area or crawl space and ducts in ventilated
attic or crawl space — R-19.
|
•
|
Walls separating one- and two-family dwellings from garage areas,
walls facing ventilated attic spaces and finished exterior basement
walls — R-13.
|
•
|
Ducts in unheated area not exposed to outside ventilation —
R-4.
|
•
|
Joints in the building conditioned envelope that are sources
of air leakage, such as around window and door frames, between wall
cavities and window or door frames, between wall assemblies or their
sill plates and foundations, between utility service penetrations
through the building envelope, shall be properly sealed with compatible
and durable caulking, gasketing, weather-stripping or other material
in an approved manner.
|
•
|
All exterior walls shall have a vapor retarder capable of reducing
vapor transmission to less than one (1) perm, installed on the inside
or the warm surface side of the insulated wall or ceiling. Only those
ceilings that are attached directly to the underside of the roof rafters,
such as flat roofs or cathedral ceilings, are required to install
the vapor retarder.
|
•
|
All windows shall have a maximum Thermal Transmittance (U) value
of 0.55.
|
32. Section 1604.1 General. Add the following to this paragraph:
The following standard structural design criteria are established:
|
|
1.
|
Roof Live Load, Minimum Unreduced = 20 psf.
|
|
2.
|
Snow Load (General Snow Load) Pg = 20 psf.
|
|
3.
|
Wind Loading (Basic wind speed (3 second gust) V = 90 mph.
|
|
4.
|
Seismic Loading
|
|
|
a.
|
Site Class D, default site class per 1613.5.2
|
|
|
b.
|
Mapped Spectral response accelerations
|
|
|
|
(1)
|
Ss = 0.167 or per USGS data
|
|
|
|
(2)
|
SI = 0.093 or per USGS data
|
33. Section 1801.2 Design Basis. Add the following to the paragraph:
The following standard design criteria are established:
|
|
1.
|
Foundation Frost Depth, Minimum = 30" (refer to 1809.5).
|
|
2.
|
Presumptive net allowable foundation bearing pressure = 1,500
psf (refer to 1803.1 and 1806.2). Note that Section 1803.5.11 and
Section 1803.5.12 require a geological investigation if the structure
has a seismic design category of C, D, E, or F.
|
34. Section 1803.2 Investigations Required. Add the following sentence
to the end of the first paragraph: The geotechnical investigation
is not required for one-story buildings two thousand five hundred
(2,500) square feet or less in size, in risk categories 1 and 2.
35. Section 1807.2.2 Design Lateral And Soil Loads. Add the following
sentence to the end of the paragraph: The geotechnical engineer must
state either if a global analysis is required.
36. Section 1808.6.2 Slab-On-Ground Foundations Add:
Exception: Slab-on-ground systems that have performed adequately
in soil conditions similar to those encountered at the building site
are permitted subject to the approval of the Building Official.
37. Section 1809.5 Frost protection Add to 1. Frost depth is thirty (30)
inches.
38. Add Sections 1811, 1811.1, 1811.2.1, 1811.2.2, 1811.2.3, 1811.2.4,
1811.2.5, 1811.2.6, 1811.3, 1811.3.1, 1811.3.2, 1811.3.3, 1811.4,
1811.5, and 1811.6 as follows:
Section 1811 Retaining Walls
|
1811.1 In addition to the other requirements as stated in this
code the following provisions shall apply to retaining walls.
|
1811.2.1 Retaining Wall — Plan Review And Construction
Inspections Process. Integral to the building foundation. The Building
Code defines a retaining wall as a wall not laterally supported at
the top that resists lateral soils load and other imposed loads. Retaining
walls that are integral to the building foundation must be approved
by the Resource Management Department prior to the issuance of a building
permit.
|
1811.2.2 Retaining Wall — Less Than Four (4) Feet In Height
Measured From The Bottom Of The Footing To The Top Of The Wall. Detailed
plans are not required. However, site plans at a minimum should indicate
top and bottom of wall elevations, existing and proposed contours,
drainage features, buildings and property lines, public easements,
parking facilities and streets. Furthermore, the City retains the
right to require additional design information regarding tiered retaining
walls if there is a concern that the upper wall may impose a surcharge
condition on the lower wall. These items will be required prior to
the issuance of a building permit.
|
1811.2.3 Retaining Wall — greater than four (4) feet in
height. Detailed plans and calculations are required to be submitted
to the Resource Management Department. However, only the items mentioned
above must be submitted prior to the issuance of a building permit.
The following additional items must be submitted prior to the beginning
of wall construction:
|
|
1.
|
A typical section showing wall and footing dimensions, backfill
slopes, steel/geotextile reinforcement details, weep hole locations
and subsurface drainage systems.
|
|
2.
|
Engineering calculations for the design of the wall, noting
all assumptions such as concrete and steel reinforcement strengths,
soil parameters, surcharges, bearing pressures, safety factors for
bearing capacity, overturning, sliding external and internal stability
and deep-seated shear failure.
|
|
3.
|
Construction plans should specify the type of backfill to be
used and any soil testing requirements if not granular. A geotechnical
investigation and report is recommended but not required.
|
1811.2.4 Failure to submit the above information prior to the
beginning of the way construction may result in the issuance of a
stop work order by the Resource Management Department until such time
the retaining wall design is reviewed and approved.
|
1811.2.5 First time submittals for plan review can take up to
two (2) weeks for review. Additional submittals have a turn around
time of one (1) week. The contractor should plan submittals accordingly
to avoid unnecessary delays in construction
|
1811.2.6 All plans, profiles, cross-sections and calculations
must be prepared and sealed by a registered professional engineer
licensed in the State of Missouri. The professional engineer is responsible
for all aspects of the retaining wall design. The use of standard
drawings from reputable manufacturers is allowable and even encouraged,
but the professional engineer who seals the drawings and computations
is responsible for the retaining wall design. In the absence of sufficient
geotechnical information, the engineer shall be responsible for any
design assumptions. Approval of the necessary plans and calculations
will not transfer or share responsibility of the retaining wall design
to the City of Centralia, Missouri.
|
1811.3 Following construction the engineer must submit a "certificate
of conformance" indicating that the backfill and foundation material
used met the requirements of the original design. This certificate
must be signed and sealed by a registered professional engineer licensed
in the State of Missouri and, at a minimum, indicate the wall was
inspected at the follow specified milestones:
|
1811.3.1 For Concrete Walls
|
|
1.
|
Footings prior to the pouring with reinforcement in place.
|
|
2.
|
Walls prior to pouring with reinforcement in place.
|
|
3.
|
At the beginning of the backfill operation.
|
|
4.
|
Following completion of the wall.
|
1811.3.2 For Modular Walls
|
|
1.
|
Footing or bearing pads.
|
|
2.
|
During backfill operations and for the first layer of soil reinforcement.
|
|
3.
|
Following completion of the wall.
|
1811.3.3 The City retains the right to request additional special
inspections for items such as: vicinity to public streets or permanent
residences, excessive wall heights or potential for groundwater or
surface runoff problems.
|
1811.4 Additional information. Retaining walls shall be designed
to ensure stability against overturning, sliding, excessive foundation
pressure and water uplift. Retaining walls shall be designed for a
safety factor of one and five tenths (1.5) [Note: If the backfill
or underlying soil is clay or clayey silt, the safety factor should
be increased to two (2.0)] against lateral sliding and overturning
and a bearing capacity of three (3.0).
|
Retaining walls with grade difference in excess of thirty (30)
inches are required to have a fence or guardrail protecting the public
from injury. The fence or guardrail must be a minimum of thirty-six
(36) inches in height in residential applications and forty-two (42)
inches in commercial applications. The vertical balusters and bottom
rail must be situated so that a four (4) inch sphere cannot pass between
any portions of the fence. Horizontal balusters will not be permitted.
|
1811.5 The property owner (or the property owner's representative)
must ensure that the retaining wall is properly designed and constructed.
The property owner is responsible for maintenance and repairs of all
retaining walls on the property. Developers are not allowed to construct
retaining walls of any size within the public right-of-way without
prior review and approval of the Resource Management Department.
|
1811.6 All retaining walls must be installed, inspected and
issued a certificate of conformance prior to the occupancy being issued
or approved by the Building Official. The Building Official retains
the right to waive this requirement under special circumstance.
|
39. Section 3109.4 Delete in its entirety and add:
Residential Swimming Pools. Residential swimming pools shall
comply with Sections 3109.4.1 through 3109.5. Residential swimming
pools shall be enclosed by a barrier consisting of metal chain link
fence, wood, stone or masonry or other material approved by the Building
Official. All swimming pool excavation sites are required to be enclosed
by a temporary construction barrier during installation. A permanent
barrier shall be installed upon completion of the pool structure.