[HISTORY: Adopted by the Township Committee
(now Township Council) of the Township of Bridgewater 4-6-1959 by Ord. No.
59-2. Amendments noted where applicable.]
The following terms shall, for the purposes
of this chapter, have the meanings herein indicated:
PERMITTEE
The person, firm or corporation obtaining a permit or his
or its duly authorized representative.
PUBLIC PLACE
Any property or easement in which the Township of Bridgewater
owns an interest. These include but are not limited to: conservation,
drainage, detention basin, sanitary sewer, and utility easements,
Township parks and open space properties.
[Added 12-6-2021 by Ord.
No. 21-20]
STREET
Any street, road or other public right-of-way dedicated to
and accepted by the Township of Bridgewater and shall include all
of the area thereof lying within the bounds of the dedicated right-of-way.
[Added 1-4-1993 by Ord. No. 93-2]
A. No person, firm or corporation, nor any utility company,
shall for any purpose open, tear up, excavate, bore, tunnel or drive
under or in any way impair the surface or subsurface within the limits
of the right-of-way of any Township road except with a written permit
from the Township Engineer as hereinafter provided.
[Amended 12-6-2021 by Ord. No. 21-20]
B. Such permit shall be valid for 30 days unless an extension
of time has been requested by the permittee and granted by the Township
Engineer in writing.
C. A copy of the permit shall be available at the work site and available
for inspection.
[Added 12-6-2021 by Ord.
No. 21-20]
[Amended 12-6-2021 by Ord. No. 21-20]
A. Application for a permit shall be made at the office of the Township
Engineer by the applicant or his/her authorized agent. There shall
be a plan or sketch of work to be done, including the nearest cross
street, and it shall describe the location of the intended opening,
excavation or tunnel, the size thereof, the purpose therefor and the
person doing the actual excavation work and the name of the person
for whom or which the work is being done and shall contain an agreement
that the applicant will comply with all ordinances and laws relating
to the work to be done.
B. The Township Engineer or his/her designated representative shall
have the authority to issue a stop-work order. Said order may be issued
if it is deemed necessary for safety issues or failure to follow this
code.
[Amended 10-3-1977 by Ord. No. 77-37; 12-6-2021 by Ord. No. 21-20]
A. No permit for street openings for any purpose shall be issued until the applicant therefor shall have first paid to the Township the fees as provided for in Chapter
94, Fees.
B. Permits issued by the Township Engineer shall be subject to the following
fees:
(2) Deposit (inspection) fee of:
(b)
Each additional square yard of opening: $50 per square yard.
Amounts can be increased at the discretion of the Township Engineer.
The Township Engineer may waive the deposit fee requirement at his/her
discretion.
|
(3) Performance/maintenance surety of $100 per square yard of opening.
Minimum surety shall be $500. Surety amounts may be increased at the
discretion of the Township Engineer. Upon completion of all work,
the contractor or homeowner shall advise the Township Engineer and
a final inspection shall be made. The surety shall be held for one
calendar year from the date of final approval. After one year from
the date of final approval, the work shall be reinspected and any
corrective work completed prior to the return of the surety.
(4) Public utilities shall be allowed to establish an escrow account
with the Township for the required deposit (inspection) fee, which
amount shall be to the approval of the Township Engineer. The Township
shall have the authority and right to draw upon the deposit fee to
cover the cost of review and inspections of ongoing road openings
throughout the Township.
A. The permittee shall be responsible for the entire
work and shall keep every portion of said work, including the temporary
pavement, in perfect order and repair during the entire period of
maintenance.
B. The period of maintenance shall be considered as a
period of one year after the date of final completion/approval of
the work to be done, except that in the event that the termination
of said one-year period shall fall within the month of December, January,
February, March or April, then the period of maintenance shall be
considered as extending until the first day of May next thereafter.
[Amended 12-6-2021 by Ord. No. 21-20]
C. In the event that the Township finds it necessary to make
emergency repairs during the period of maintenance, the permittee
shall immediately deposit the cost of making such emergency repairs
with the Township Treasurer. No permits shall be issued to any person,
firm or corporation who is in default to the Township on any such
payment.
[Amended 1-4-1993 by Ord. No. 93-2; 12-6-2021 by Ord. No. 21-20]
It shall be the responsibility of the permittee
to give proper notice of the proposed street opening to any person,
firm or corporation whose pipe, conduits or other structures are laid
in the portion of the street to be opened. Said notice shall be given
to all utilities by calling the New Jersey One Call Center before
commencement of said opening or as provided by law. The permittee
shall, at his own expense, carefully support, maintain in operation
and protect from injury such pipes, conduits or other structures.
The permittee shall restore any damaged structures or utilities, at
his own expense, to the condition it was in prior to commencement
of work.
A. All excavations shall be completely backfilled at
the end of each working day unless it would constitute a hardship
to the permittee or where the sale of the excavation makes it impossible
to backfill at the end of each working day, in which event a waiver
may be granted by the Township Engineer or his/her designated representative.
In the event that a waiver is granted, the contractor or owner shall
cover the excavation with heavy one-inch-thick plates secured by existing
pavement to prevent rattles and movement and erect appropriate barriers
and lights around the entire excavation and arrange to provide appropriate
security protection, if such security is necessary, at his own cost,
and such other safeguards as may be needed to protect the public from
an open excavation. If plates are placed for over a weekend or for
an extended period, all edges are to be macadam-sealed and sloped.
In no event shall an excavation be left open for more than 72 hours
unless an emergency exists and permission has been secured from the
Chief of Police, Township Engineer or their designated representatives.
[Amended 1-4-1993 by Ord. No. 93-2; 12-6-2021 by Ord. No. 21-20]
B. Barricades, warning flags and lights shall be provided
in accordance with the Manual on Uniform Traffic Control Devices,
and watchmen shall be provided if so ordered by the Township Engineer
or Chief of Police, and in accordance with his/her directions.
[Amended 1-4-1993 by Ord. No. 93-2; 12-6-2021 by Ord. No. 21-20]
C. Where the free flow of traffic is interfered with,
the permittee shall furnish competent persons to direct and expedite
traffic.
D. Unless otherwise authorized by the Township Engineer,
vehicular traffic shall be maintained at all times during the progress
of the work. On paved streets, at least a nine-foot width of the pavement
shall be open and unobstructed at all times.
[Amended 12-6-2021 by Ord. No. 21-20]
E. The permittee shall notify the Police Department and Township Engineer
of any work in a public right-of-way at the start of construction
and each day thereafter until the work is complete.
[Added 12-6-2021 by Ord.
No. 21-20]
Nothing in this chapter shall be construed as
requiring the issuance of a permit for the performance of any work
done under a contract with the Township.
A. The use of power excavating equipment is prohibited
within the pavement limits until each edge of the trench has been
cut through the entire thickness of the pavement to an even, uniform
line.
B. The maximum width of any trench for sewer or utility
connections shall be 30 inches unless a greater width is approved
in writing by the Engineer.
C. Excavated material shall be stored in neat piles,
so placed as to cause the least inconvenience with the use of the
roadway or sidewalk. If so ordered by the Township Engineer, such
excavated material shall be promptly removed from the site of the
work.
[Amended 12-6-2021 by Ord. No. 21-20]
D. Special permission may be granted for tunneling under
a pavement of concrete or one having a concrete base, in which case
the tunnel shall be refilled with one-to-three-to-six concrete, well
tamped in place.
E. Unless otherwise authorized, the work of passing under sidewalks and curbing shall be done by tunneling and refilling as provided under Subsection
D.
A. As soon as the pipe or structures are in place and
any required inspection has been made, the excavation shall be backfilled.
B. The backfilling shall be placed in layers not more
than six inches thick and each layer shall be thoroughly compacted
with mechanical rammers of a type satisfactory to the Township Engineer.
(The Township Engineer may permit layers in excess of six inches if,
in his opinion, the rammers used will properly compact a greater thickness.)
[Amended 12-6-2021 by Ord. No. 21-20]
C. All excavations within a Township right-of-way shall
be backfilled with dense graded aggregate. If the material removed
from the excavation is of such character that, in the opinion of the
Engineer, it will not compact satisfactorily, the permittee shall
provide suitable material from other sources for the backfilling.
[Amended 12-6-2021 by Ord. No. 21-20]
D. When the trench is brought to grade, all surplus material
shall be forthwith removed from the site by the permittee at his own
expense.
[Amended 12-6-2021 by Ord. No. 21-20]
E. Unless dense graded aggregate is required, a material
whose composition is inorganic soil, blasted or broken rock and similar
materials of natural or man-made origin, including mixtures thereof,
with a maximum aggregate size of three inches shall be considered
suitable materials. Backfill material shall be free from vegetable
matter, rubbish, frozen earth, wood, cinders, broken paving or other
foreign substances. The materials shall be free of shale or other
soft, poor durability particles.
[Added 1-4-1993 by Ord. No. 93-2; amended 12-6-2021 by Ord. No. 21-20]
F. All materials used for backfill shall be free from
bricks, blocks, excavated pavement materials and/or organic material
or other debris.
[Added 1-4-1993 by Ord. No. 93-2; amended 12-6-2021 by Ord. No. 21-20]
G. All backfill must contain the moisture content necessary
for the proper compaction of that material. The excavator shall be
responsible for determining the proper limits as the work is progressed.
[Added 1-4-1993 by Ord. No. 93-2]
[Amended 1-4-1993 by Ord. No. 93-2; 12-6-2021 by Ord. No. 21-20]
Immediately after backfilling the excavation,
the permittee shall replace any pavement disturbed with HMA 9.5M64
surface course of the same thickness, but in no case less than four
inches thick, placed in two lifts.
Small pipes or conduits may be driven beneath
pavements in such a manner that the surface shall not be disturbed
or injured and provided that:
A. In the event of damage to a pavement or subsurface
pipe or structure caused by driving such pipe or conduit, the permittee
shall repair and make good the damage at the permittee's own expense.
B. Driving of pipes shall be prohibited at locations
in the highways where there is existing underground construction of
any telecommunication, electric or gas utility company.
[Amended 12-6-2021 by Ord. No. 21-20]
[Amended 1-4-1993 by Ord. No. 93-2; 12-6-2021 by Ord. No. 21-20]
A. All conditions of this chapter shall apply to public
utility corporations. In addition to an application and deposit (inspection)
fee, each public utility shall post a continuing bond in the amount
of $100,000 to insure and guarantee restoration of the roads, compliance
with the specifications and all the obligations set forth in this
chapter.
B. Permits shall be required of all public utility companies
for work under this chapter. Applications must be made to the office
of the Township Engineer at least 48 hours prior to the work starting.
Where an emergency exists, excavation and repair may begin but the
utility must notify the Township Engineer and the Township Police
Department of the nature and location of the emergency before starting
work and must apply for the necessary permit as soon as possible.
C. In the event that permanent pavement replacement is
not made within the six-month period hereinbefore referred to or within
the one-year maintenance period, then the Township, through its Engineer,
shall have the right to give 10 days' notice of such fact to the public
utility corporation, and if such permanent pavement has not been properly
installed at the expiration of such ten-day period, then the Township
may proceed to replace and install such pavement and to perform such
work as may be required and charge the cost thereof to such public
utility corporation.
[Added 8-15-1994 by Ord. No. 94-23; amended 12-6-2021 by Ord. No. 21-20]
The Township Engineer shall provide notice to
all persons owning property abutting on the street about to be paved
or improved and to all public utilities and authorities operating
in the Township, including any person, firm or corporation owning
any sewer main or conduit or other utility in, above or under said
street. This notice shall be made by mail (or email) as soon as the
information is available, but no later than 30 days before the notice
to proceed is sent to the contractor. Such notice shall notify such
persons, firms, corporations or public utilities that:
A. They shall make all connections, as well as repairs
thereto, which would necessitate excavation of the street, within
30 days from the giving of such notice. The time shall be extended
if permission is requested in writing and approved by the Township
Engineer.
B. No excavation permit shall be issued for openings,
cuts or excavations in said streets for a period of seven years after
the date of completion of said improvement, paving or repaving by
the Township.
[Amended 2-7-2022 by Ord. No. 22-01]
C. The application for excavation permits for work to
be done prior to such paving or repaving shall be submitted promptly
in order that the work covered by the excavation permit shall be completed
as soon as practicable and in no event later than the date specified
in the permit for the excavation work.
[Added 12-6-2021 by Ord.
No. 21-20]
In the instance where administration of this Code or inspection
of an excavation is complex, and therefore unusually costly to the
Township to monitor, the Township Engineer may require an applicant
or permittee to pay any additional sum in excess of the amounts charged
pursuant to this Code. This additional sum shall be sufficient to
recover the actual costs incurred by the Township and shall be charged
solely on a time and materials basis. Whenever additional fees are
charged, the Township Engineer shall provide in writing the basis
for their imposition.
[Added 12-6-2021 by Ord.
No. 21-20]
A. The applicant shall indemnify and save harmless the Township, its
officers and employees, from all suits, actions or claims of any character
brought because of any injuries or damage received or sustained by
any person, persons or property on account of or in consequence of
any neglect in safeguarding the work; or through use of unacceptable
materials in constructing the work; or because of any act or omission,
neglect, or misconduct of said applicant; or because of any claims
or amounts recovered from any infringements of patent, trade work,
or copyright; or from any claims or amounts arising or recovered under
the Workers' Compensation Act, or any other law, ordinance, order,
or decree; and so much of the money due the said applicant under and
by virtue of his work under this permit as may be considered necessary
by the Township for such purpose may be retained for the use of the
Township; or in case no money is due, his surety may be held until
such suit or suits, action or actions, claim or claims for injuries
or damages as aforesaid shall have been settled and suitable evidence
to that effect furnished to the Township; except that money due to
the applicant will not be withheld when the applicant produces satisfactory
evidence that he is adequately protected by public liability and property
damage insurance.
B. The applicant shall also notify its insurance company that it has
entered into an indemnification agreement with the Township and that
the terms of the indemnification should be covered by the applicant's
insurance.
C. The contractor shall carry and maintain, at all times while the contract
is in full force and effect, the following insurance coverage with
an insurance company or companies acceptable to the Township of Bridgewater,
with limits not less than those shown below. A certificate of insurance
shall be filed with the Township of Bridgewater prior to commencement
of the work.
(1)
Commercial general liability (CGL): Coverage for all operations,
including, but not limited to, contractual, products and completed
operations, and personal injury with limits no less than $1,000,000
per occurrence/$2,000,000 aggregate per project. The Township of Bridgewater,
its officers, officials, employees, agents and volunteers shall be
included as an additional insured.
(2)
Automobile liability: Coverage for all owned, non-owned and
hired vehicles with limits not less than $1,000,000 per occurrence,
combined single limits (CSL) or its equivalent.
(3)
Workers' compensation: As required by the State of New Jersey
and employers liability with limits not less than $1,000,000 per accident
for bodily injury or disease.
D. Coverage on primary and noncontributory basis: The certificate of
insurance should indicate that all insurance coverages will provide
coverage on a primary and noncontributory basis to the Township of
Bridgewater, its officers, officials, employees, agents and volunteers,
who shall be included as an additional insured.
E. Notice of cancellation: Each insurance policy required above shall
provide that coverage shall not be canceled, except with notice to
the entity.
F. Special risks or circumstances: The Township of Bridgewater reserves
the right to modify these requirements, including limits, based on
the nature of the risk, prior experience, insurer, coverage, or other
special circumstances.
[Added 8-15-1994 by Ord. No. 94-23; amended 12-6-2021 by Ord. No. 21-20]
A. No permit shall be issued by the Township Engineer to any person, firm, corporation, public utility or authority given notice under §
89-15 above which would allow an excavation or opening in a paved or improved street surface less than seven years old, unless the applicant can clearly demonstrate to the Township Engineer that public health or safety requires that the proposed work be permitted which could not have been reasonably foreseen at the time of the prior notice.
[Amended 2-7-2022 by Ord. No. 22-01]
B. An emergency
or hardship shall include a water main break, gas leak, sanitary sewer
break, or any other situation which may result in harm to the public's
health, safety, or welfare or damage to public or private property.
C. If by special permission of the Township Engineer
a permit is issued to open any paved or improved street surface less
than seven years old, the permittee shall be required to complete
restoration in the following manner:
[Amended 2-7-2022 by Ord. No. 22-01]
(1) The applicant shall mill and resurface the entire
street or portion thereof in which the opening or excavation is made,
from curb to curb and for a minimum distance extending no fewer than
10 feet beyond the limits of the excavation.
(2) Construction or repair work performed on, in or around
manholes shall be subject to inspection and acceptance by the Township
Engineer.
(3) The permittee must also pay all required application
and deposit (inspection) fees. The deposit (inspection) fee shall
be calculated to cover the entire area that must be milled and resurfaced.
[Added 8-15-1994 by Ord. No. 94-23]
The provisions of this chapter shall not apply
to public utility companies having separate contracts with the Township
or operating under special ordinances or statutes, nor to any person,
firm or corporation laying any sidewalk, pavement or sewer or doing
any other work in any of said streets, avenues, roads or highways
under and in pursuance of a contact entered into between such person,
firm or corporation and the Township, provided that these provisions
or the equivalent are incorporated in any said contract, specifications
or requirements.
[Added 8-15-1994 by Ord. No. 94-23]
Appeals from any determinations hereunder shall
be to the Construction Board of Appeals.
[Amended 10-3-1977 by Ord. No. 77-37]
Any person, firm or corporation who or which
shall violate any provision of this chapter shall be subject to a
fine not exceeding $500 or imprisonment for a term not exceeding 90
days, or both, for each offense. Each day during which any such violation