[Adopted 7-16-1979 by Ord. No. 1131[1]]
[1]
Editor's Note: Ordinance No. 1201, adopted 9-13-1982, reassigned the numbering and readopted this article (formerly Ch. 34, Fees, Art. II Site Plan Applications).
A. 
The following fee shall be charged by the Planning Board of the Borough of Ridgefield for all site plan applications filed with the Planning Board pursuant to Ordinance No. 1054[1] where the proposed construction is such that the gross volume of the proposed structure can be ascertained. All site plan applicants shall be charged a fee computed by multiplying the gross volume of the proposed structure by thirty-five hundred-thousandths (0.00035). This fee formula is equivalent to 10% of the construction permit fee charged by the Borough Building Inspector, which is derived from the Building Officials and Code Administrators Code of 1978. However, notwithstanding any provision of this section, no such site plan application fee shall be less than $35 nor more than $150.
[1]
Editor's Note: See Part 4, Site Plan Review, of this chapter.
B. 
The following fee shall be charged by the Planning Board of the Borough of Ridgefield for all site plan applications filed with the Planning Board pursuant to Ordinance No. 1054[2] where the proposed construction is such that the gross volume of the proposed structure cannot be ascertained. All such site plan applicants shall be charged a fee of $0.50 per $1,000 of the construction cost of the proposed structure. However, notwithstanding any provision of this Article, no such site plan application fee shall be less than $35 nor more than $150.
[2]
Editor's Note: See Part 4, Site Plan Review, of this chapter.
The aforesaid fees as described in § 390-203 shall be inclusive of all publication fees and notice fees.