The procedures contained within this article shall not apply
to activities involved in the necessary normal maintenance and upkeep
of property. Necessary normal maintenance and upkeep of property shall
include, but not be limited to the following activities as determined
by the CEO:
D. Removal of dead or deteriorating vegetation;
G. Repair of faulty or deteriorating sewage facilities;
H. Reconstruction of structures damaged by a natural disaster; and
Applications for an EPOD development permit shall be made in
writing to the CEO by the property owner or his/her agent and be accompanied
by the following:
A. A scale plan prepared and certified by a licensed engineer or licensed
land surveyor indicating:
(1) A vicinity sketch and boundary line survey of the site.
(2) The location of all EPOD boundaries on the property as defined by
this article.
(3) Location of any building, structures, utilities, sewers, water and
storm drains on the site where the work is to be performed.
(4) Location of any building or structure on land of adjacent property
owners within 100 feet of the site.
(5) Location of all proposed new structures, additions or alterations
to existing structures and impervious surfaces on the site.
(6) Existing and proposed contour levels at five-foot intervals maximum
(one-foot contour intervals are required within the Steep Slope District).
(7) All existing shrub masses and trees with a diameter of two inches
or more are to be accurately located on the plan.
(8) The location of existing and proposed drainage patterns on the site.
B. An application fee as determined by the Village Board.
After the approval of the application and before the issuance
of any permit, the applicant shall furnish the CEO an irrevocable
letter of credit in an amount to be approved by the Village Engineer;
which letter shall ensure that all items as may be deemed necessary
are constructed in accordance with the approved plan and the standards
and specifications of the Village of Honeoye Falls. Said irrevocable
letter of credit shall continue in full force and effect until the
Village Engineer has certified to the CEO that all items have been
completed.