[R.O. 1996 § 140.050; Ord. No. 1787, 9-26-2005; Ord. No. 1880 §§ 1 — 3, 2-12-2007; Ord. No. 1925 §§ 1 — 3, 10-22-2007; Ord. No. 1934 §§ 1 —
3, 12-27-2007; Ord. No.
1978 §§ 1 — 3, 7-14-2008; Ord. No. 2131 §§ 1
— 3, 2-14-2011; Ord. No. 2141 §§ 1 — 3, 3-28-2011; Ord. No. 2399, 11-28-2016; Ord. No. 2464, 4-22-2019; Ord. No. 2481, 10-28-2019]
The fees for new development for
the expenses of inspection and future maintenance and repairs shall
be as set out in the Comprehensive Fee Schedule. The fees described
in the Comprehensive Fee Schedule will be paid by the developer, builder,
resident or his/her representative, and payment is due prior to permits
being issued. Development must be approved by the City's Engineering
and Planning Division of the Public Works Department. The fees shall
apply to any proposed development or construction that has received
approval after January 1, 2017.
[R.O. 1996 § 140.055; Ord. No. 2443, 9-24-2018]
A. The City of Grain Valley will waive plan
review, building permit and inspection fees, which would normally
be required for the construction or remodel of buildings in the City
limits, for local political subdivisions at one hundred percent (100%).
B. The City of Grain Valley will prorate tap
fees based on the percentage of the political subdivision's population
who reside within the City limits based on the latest available United
States Census data.
C. The City of Grain Valley will waive and/or
reduce the plan review, building permit, inspection and tap fees in
the following manner:
Political Subdivision
|
Plan Review, Permit and Inspection
Fees
|
Tap Fees
|
---|
Central Jackson County Fire District
|
Waived - 100%
|
Reduced by the percentage of the
political subdivision's population which resides within the City limits
of Grain Valley. Population counts will be determined by the most
recent census data.
|
Grain Valley R-V School District
|
Jackson County
|
Mid-Continent Library
|