[R.O. 1996 § 140.050; Ord. No. 1787, 9-26-2005; Ord. No. 1880 §§ 1 — 3, 2-12-2007; Ord. No. 1925 §§ 1 — 3, 10-22-2007; Ord. No. 1934 §§ 1 — 3, 12-27-2007; Ord. No. 1978 §§ 1 — 3, 7-14-2008; Ord. No. 2131 §§ 1 — 3, 2-14-2011; Ord. No. 2141 §§ 1 — 3, 3-28-2011; Ord. No. 2399, 11-28-2016; Ord. No. 2464, 4-22-2019; Ord. No. 2481, 10-28-2019]
The fees for new development for the expenses of inspection and future maintenance and repairs shall be as set out in the Comprehensive Fee Schedule. The fees described in the Comprehensive Fee Schedule will be paid by the developer, builder, resident or his/her representative, and payment is due prior to permits being issued. Development must be approved by the City's Engineering and Planning Division of the Public Works Department. The fees shall apply to any proposed development or construction that has received approval after January 1, 2017.
[R.O. 1996 § 140.055; Ord. No. 2443, 9-24-2018]
A. 
The City of Grain Valley will waive plan review, building permit and inspection fees, which would normally be required for the construction or remodel of buildings in the City limits, for local political subdivisions at one hundred percent (100%).
B. 
The City of Grain Valley will prorate tap fees based on the percentage of the political subdivision's population who reside within the City limits based on the latest available United States Census data.
C. 
The City of Grain Valley will waive and/or reduce the plan review, building permit, inspection and tap fees in the following manner:
Political Subdivision
Plan Review, Permit and Inspection Fees
Tap Fees
Central Jackson County Fire District
Waived - 100%
Reduced by the percentage of the political subdivision's population which resides within the City limits of Grain Valley. Population counts will be determined by the most recent census data.
Grain Valley R-V School District
Jackson County
Mid-Continent Library