[Adopted 4-14-2020 by Ord. No. 6-20]
A. 
In addition to the permit fees outlined in this chapter, there shall be a separate charge in the nature of a connection fee or tapping fee for each new connection, per living unit or dwelling unit equivalent flow for commercial development, of any property, to the sewage system. Such charge shall be in addition to the actual costs of connection, which shall be borne by the property owner or occupant.
B. 
Each owner of real estate whose property is hereafter newly connected with the main sanitary sewer collection system shall pay the sum of $1,000 per living unit. This connection fee is within that allowed by N.J.S.A. 40A:26A-11.
C. 
This fee covers only connections where there were none previously.