[Amended 4-12-1988 by Ord. No. 88-861]
The Borough Council shall designate the public officer, who shall serve for a term of one year, to administer and enforce the provisions of this chapter of the Montvale Code. The public officer may be the Building Code or Subcode Official or be known as the "Zoning Officer"; provided, however, that the within shall not limit the power of other enforcement officers of the municipality from citing violations of Chapter
400, Zoning, of the Montvale Code.
[Added 5-13-1997 by Ord. No. 97-1055]
A. Site work permit
required.
(1) No
site work shall be performed, including but not limited to demolition
or site clearance, until a site work permit is issued.
(2) Upon
the Montvale Planning Board approving any development or when the
Borough Engineer approves minor site alterations, the developer or
his authorized agent or representative shall make written request
to and obtain from the Building Department a site work permit. The
developer or his authorized agent or representative shall also provide
a copy of the same to the Borough Engineer.
B. Definitions.
As used in this section, the following terms shall have the meaning
indicated:
SITE WORK
Refers to work on a site that includes demolition, clearing,
excavation, filling, soil moving, paving, drainage and any other site
work not covered by a building permit.
C. Issuance of site work permit.
Upon receipt of the site work permit fee, the Building Department
shall issue a site work permit.
D. Site work permit fee. Every individual
or entity seeking a site work permit shall pay a nonrefundable fee
of $50 to the Building Department. This fee shall be delivered at
the time application is made for a permit.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. II)]
E. Enforcement. This chapter shall
be enforced by the Construction Code Official, Zoning Officer, Borough
Engineer or Police Department of the Borough of Montvale.
F. Violations and penalties; notice
of violation.
(1) See Ch.
1, General Provisions, Article
I, General Penalty.
[Amended 2-27-2007 by Ord. No. 2007-1262]
(2) In addition to the penalty set forth in Subsection
A of this section, the Borough Engineer, Zoning Officer, Police Department or Construction Official may issue a notice of violation and orders to terminate directing discontinuance of the violation.
Any valid and legally subsisting nonconforming
use or structure existing at the time of the passage of this chapter
may be continued upon the lot or in the building so occupied, and
any such structure may be restored or repaired in the event of partial
destruction of less than 50% thereof; the Borough of Montvale reserving,
however, all its rights and remedies with respect to nonconforming
uses as provided in the New Jersey Revised Statutes. It is the express
intent of this chapter that no uses existing in violation of previous
ordinances, and the amendments, supplements and codifications thereto,
shall become valid nonconforming uses or structures by the adoption
of this chapter.