The applicant should provide a financial guarantee to the municipality
for the timely installation and proper construction of all stormwater
management controls as required by the approved Delaware River South
Stormwater Management Plan and this chapter equal to the full construction
cost of the required controls.
It shall be unlawful to alter or remove any permanent stormwater
facility or BMP required by an approved stormwater control and BMP
operations and maintenance plan, or to allow the property to remain
in a condition which does not conform to an approved stormwater control
and BMP operations and maintenance plan.