[Adopted 6-1-1959 (Ch.
72, Art. I, of the 1971 Code)]
In new developments within the incorporated limits of the Village
of Boonville, requiring New York State Board of Health approval pursuant
to §§ 1115, 1116 and 1117 of the Public Health Law,
the owner and/or developer shall pay the following costs of construction
of storm and sanitary sewers:
A. The developer shall pay 100% of the actual cost of the sewer pipe
and labor of laying and refilling, and shall pay the actual cost of
construction of manholes.
B. The developer may construct the sewer lines after submitting plans
for approval by the Board of Trustees and upon approval of the plans
and specifications by the State Board of Health.
C. All construction and specifications of materials are to be under
the supervision of the Board of Trustees.
D. In the event the Village does the actual construction, the cost of
the sewer pipe shall be paid by the owner and/or developer in advance
and the cost of labor of laying and refilling shall be paid upon completion
of construction and before connection.
[Amended 12-29-1971]
Any person violating any of the provisions of this article shall
be punished, upon conviction, by a fine not exceeding $250 for each
violation. In addition, each violation of this article shall constitute
disorderly conduct, and each person violating the same shall be a
disorderly person. Each day that a violation or failure to comply
with any provision of this article or any regulation promulgated hereunder
by the Board of Trustees occurs shall constitute a separate and distinct
violation.
[Adopted 6-1-1959 by
the Water Commissioners (Ch. 72, Art. II, of the 1971 Code)]
For any new street, road or highway approved and accepted by
the Village of Boonville, the Water Department will install and maintain
mains or water lines, including pipe, valves, hydrants, etc., where
necessary. Cost of such project will be as follows:
A. Developer of street to pay 50% of the actual cost from the nearest
main available. This cost includes pipe, digging and backfilling of
ditch, and labor of installing.
B. Developer of street to pay in advance as follows:
|
2-inch line: $0.50 per foot
|
|
4-inch line: $1.00 per foot
|
|
6-inch line: $1.50 per foot
|
(1) Balance of actual cost to be paid when water is turned on.
(2) For any main over six inches, the Water Department will establish
the rate. All prices to be payable in advance.
C. The Water Department will pay 50% of the actual cost of pipe, digging
and backfilling of ditch, and labor of installing pipe.
D. In addition, the Water Department will furnish and install all necessary
valves and hydrants, and make all necessary taps, free of charge.
E. If solid rock is encountered, the developer will be required to pay
75% of the cost of removing rock.