A. 
Prior to the granting of final approval, the subdivider shall have installed or shall have furnished performance guarantee for the installation of the following:
(1) 
Streets.
(2) 
Concrete structures.
(3) 
Curbs and gutters.
(4) 
Sidewalks.
(5) 
Storm sewerage.
(6) 
Manholes, inlets and catch basins.
(7) 
Sanitary sewers.
(8) 
Shade trees.
(9) 
Topsoil protection.
(10) 
Streetlighting.
(11) 
Monuments.
(12) 
Street signs.
(13) 
Erosion control.
B. 
All of the above listed improvements shall be subject to inspection and approval by the Township Engineer who shall be notified by the subdivider at least 24 hours prior to the start of construction. No underground installation shall be covered until inspected and approved.
C. 
Inspection by the Township Engineer must be made within 72 hours, Sundays, Saturdays and legal holidays excepted, after such notification by the subdivider, and, in the event such inspection is not made by the Township Engineer, approval shall be presumed.