[Ord. 24-1982 § 1, passed 3-17-1982]
The Traffic Engineer of the City shall post a sign or signs
as in his judgement are required at railroad bridges and/or overpasses
in the City designating the height of the clearance between such bridge
and/or overpass and the street passing beneath such bridge and/or
overpass.