[Ord. 30-2004, passed 6-2-2004; Ord. 27-2019, passed 4-17-2019]
[Ord. 30-2004, passed 6-2-2004; Ord. 27-2019, passed 4-17-2019]
Plan Review - New Construction
| |
---|---|
Type
|
Fee
|
Use Groups B, E, M, R-1, R-2, R-3, R-4
|
$0.06 per square foot (up to 15,000 square feet plus $0.04 (15,001
square feet to Total)
|
Use Groups A, H, I
|
$0.06 per square foot (up to 20,000 square feet) plus $0.04
(20,001 square feet to Total)
|
Use Groups F, S, U
|
$0.06 per square foot (up to 12,000 square feet) plus $0.04
(12,001 square feet to Total)
|
Individual Discipline Review Fees:
| |
Mechanical review fee
|
12% of building plan review fee
|
Plumbing review fee
|
12% of building plan review fee
|
Electrical review fee
|
12% of building plan review fee
|
Fire protection (speaker and/or alarm)
|
12% of building plan review fee
|
Individual Discipline Only Fee (MEP & FP)
|
$250 for first 5 sheets plus $250 for each 10 sheets or portion
thereafter
|
Minimum new construction review fee (IBC regulated)
|
$250
|
One- and two-family dwelling or townhouse (IRC regulated)
|
$150/unit
|
Plan Review - Alteration/Change of Use
| |
Use Groups B, E, M, R-1, R-2, R-3, R-4
|
$0.05 per square foot (up to 15,000 square feet) plus $0.03
(15,001 square feet to Total)
|
Use Groups A, H, I
|
$0.05 per square foot (up to 20,000 square feet) plus $0.03
(20,001 square feet to Total)
|
Use Groups F, S, U
|
$0.05 per square foot (up to 12,000 square feet) plus $0.03
(12,001 square feet to Total)
|
Individual Discipline Review Fees:
| |
Mechanical review fee
|
10% of building plan review fee
|
Plumbing review fee
|
10% of building plan review fee
|
Electrical review fee
|
10% of building plan review fee
|
Fire protection (speaker and/or alarm)
|
10% of building plan review fee
|
Minimum alteration review fee
|
$200
|
All reviews reflect an initial review and review of 1 subsequent
revision. Any additional required reviews shall be conducted at 15%
of the respective discipline review fee. Minimum re-review fee = $75.
| |
Fees are established on the basis of per square foot of "gross
floor area" (GFA), which includes total square footage of all floors
within the perimeter of the outside walls, including basements, cellars,
garages, roofed patios, breezeways, covered walkways and attics with
a floor-to-ceiling height of six feet six inches or greater.
| |
3 sets of plans must be submitted for review. Upon approval,
1 set of original stamped plans must be present at the job site until
completion of the project. A scanned copy of the approved plans is
required to obtain a permit with the City of Erie.
| |
Plan Scanning and Archiving
|
$1.25 per sheet
|
[Ord. 30-2004, passed 6-2-2004; Ord. 27-2019, passed 4-17-2019; Ord. No. 4-2023, passed 1-18-2023]
All applications for building permits shall be accompanied with
payment of an administration and technology fee in the amount of $25.
In addition, the following fees shall be paid:
(a)
Construction.
Construction Cost
|
Fees
|
---|---|
Up to $2,000
|
$25
|
$2,001 and up
|
$25 plus $7 per $1,000 in excess of $2,000
|
(b)
Emergencies and weekend call-out inspections: $300.
(c)
Inspection for certificate of occupancy: $100.
(d)
Fences.
Cost of Fence
|
Fees
|
---|---|
Up to $2,000
|
$25
|
$2,001 and up
|
$25 plus $7 per $1,000 in excess of $2,000
|
[Ord. 30-2004, passed 6-2-2004; Ord. 27-2019, passed 4-17-2019; Ord. No. 4-2023, passed 1-18-2023]
Type
|
Fee
| |
---|---|---|
(a)
|
Administration and Technology Fee
|
$25
|
(b)
|
Service and Feeders
| |
200 amp or less
|
$50
| |
201 amp to 400 amp
|
$85
| |
Over 400 amp
|
$20 per 100 amp
| |
Sub-feeders or sub panels
| ||
Over 600 volt
|
$25
| |
Additional meter
|
$10
| |
(c)
|
Residential Flat Rate Inspections
| |
2 trip maximum
| ||
Minimum trip to 15 devices
|
$50
| |
Each additional trip
|
$25
| |
Each additional device or fixture
|
$1
| |
Service 200 amps or less
|
$50
| |
Each additional device
|
$1
| |
Service 201 to 400 amps
|
$85
| |
Each additional device
|
$1
| |
Each disconnect
|
$10
| |
(d)
|
Commercial
| |
Minimum trip to 15 devices only
|
$75
| |
Each additional device or fixture
|
$1
| |
Signaling, communication and alarm to 15 devices
|
$75
| |
Each additional device
|
$1
| |
(e)
|
Heating, Cooling, Cooking, Appliances, Equipment, Motors, Generators,
Transform Capacitors, Etc.
| |
Less than 1/3 hp, kw, kva, or kvar
|
Use finished wiring fee
| |
Over 1/3 hp, kw, kva, or kvar:
| ||
1/3 to 1.0
|
$12
| |
1.1 to 5.0
|
$15
| |
5.1 to 10.0
|
$20
| |
10.1 to 30.0
|
$25
| |
30.1 to 50.0
|
$30
| |
50.1 to 100.0
|
$35
| |
Over 100
|
$100
| |
Over 600 volt
|
2x above fees
| |
(f)
|
Miscellaneous
| |
Temporary pole service
|
$50
| |
Real estate inspection
|
$75
| |
Emergencies and weekend call-out inspections
|
$300
| |
Pool inspections - two trips
|
$325
| |
Third and each additional trip
|
$50
|
[Ord. 30-2004, passed 6-2-2004; Ord. 27-2019, passed 4-17-2019]
[1]
Editor's Note: Former §§ 1502.06 through 1502.79,
which set forth electrical contractor licensing and plumbing contractor
licensing provisions, adopted 6-2-2004 by Ord. No. 30-2004, as amended
4-17-2019 by Ord. 27-2019 and 3-7-2007 by Ord. 9-2007, were repealed
8-17-2022 by Ord. No. 43-2022. See Article 333 for current regulations.
[Ord. 30-2004, passed 6-2-2004]
From and after January 1, 1959, no person shall operate a rooming
house or shall occupy or let to another for occupancy any rooming
unit in any rooming house, unless he holds a rooming house permit
issued by the Building Code Official.
[Ord. 30-2004, passed 6-2-2004]
Application for permit shall be made by the operator to the
Building Code Official on forms furnished by the City of Erie. The
application shall include:
(a)
The name and address of the operator, and the name and address
of the owner, if the operator is not the owner;
(b)
The location of the rooming house, including the street and
number for each entrance;
(c)
The number of rooming units occupied or available for occupancy,
and the number of persons who may be accommodated in accordance with
the provisions of this Code: and
(d)
Such other information as the Building Code Official may by
rule or regulation require.
[Ord. 30-2004, passed 6-2-2004]
A permit shall be issued by the Building Code Official to the
operator upon reasonable proof that:
[Ord. 30-2004, passed 6-2-2004]
A Building Code Official shall grant or deny a license application,
in whole or in part, within 15 business days of the filing date or
the application is deemed approved. Reasons for the denial shall be
in writing and sent to the license applicant. The Building Code Official
and the applicant may agree in writing to extend the deadline by a
specific number of days. A license applicant may request extensions
of time or variances or appeal a Building Code Official's action on
the license application to a Board of Appeals under Section 1503.062
(relating to appeals, variances and extensions of time).
[Ord. 30-2004, passed 6-2-2004]
The annual licensing fee shall be as follows:
Number of Rooms
|
Licensing Fee
|
---|---|
1 through 4
|
$25
|
5 through 9
|
$50
|
10 through 24
|
$75
|
50 through 149
|
$200
|
150 or more
|
$300
|
No reduction in the fee shall be made for fractional yearly
licensing. The license shall expire at the end of the calendar year
in which it is issued and shall be renewed annually at the rate established.
|
[Ord. 55-2008, passed 12-3-2008]
Engaging in the work of Electrical Contracting or Plumbing Contracting
requiring a License hereunder without having first obtained a current
License for such work is hereby declared to be a Summary Offense.
Upon conviction of such offense, a penalty not to exceed $1,000 and/or
incarceration of not more than 90 days shall be imposed.