[R.O. 1966 C.S. § 3:1-27]
a. 
No person, except as hereinafter provided, shall construct, install, or make alteration to any equipment, device or apparatus likely to emit air pollution into the open air, or any equipment, device or apparatus, the use of which is intended to eliminate, reduce or control the escape or emission of any air pollutant within the City limits, until an installation permit for such construction, installation or alteration shall have been issued by the Director.
b. 
No permit shall be required in the following instances:
1. 
Internal combustion engines, and motor vehicles.
2. 
Repairs to previously approved equipment.
[R.O. 1966 C.S. § 3:1-28]
An installation permit shall be required for each unit of equipment, device or apparatus under the provisions of Section 16:21-40.
[R.O. 1966 C.S. § 3:1-29]
a. 
An application for an installation permit shall be made in writing to the Director on such forms as may be prescribed or required by him/her in accordance with the rules and regulations of the Agency.
b. 
The applicant shall furnish the Director with pertinent information respecting the equipment, apparatus, work to be done, and description of the building or structure in which such equipment or apparatus is located or to be located, together with such other information as is required by the Director in accordance with the rules and regulations.
c. 
Each application for a permit shall be accompanied by a set of plans and specifications constituting a part of such application. The plans shall clearly show, in adequate detail, the proposed arrangement, size and location of equipment, including air supply ducts, breeching, stacks, exhaust vents or other conveyors, attached thereto, and the location of the premises identified by street address.
d. 
Specifications shall be in sufficient detail so that they shall clearly reveal the proposed means for the control of the emission of air pollutants. The specification shall include a statement showing the calculated heating or fuel-burning equipment and the type and quality of fuel to be used.
[R.O. 1966 C.S. § 3:1-30]
The permit fee for each unit of equipment, in accordance with the schedule of fees set forth in Article 7 of this chapter, shall be paid upon the filing of the application for such installation permit with the Director.
[R.O. 1966 C.S. § 3:1-31]
No construction, installation or alteration shall be made which is not in strict accordance with the application and pertinent information upon which the installation permit was issued, without the express written approval of the Director after the filing of an amended application and plans and specifications pursuant thereto.
[R.O. 1966 C.S. § 3:1-32]
The issuance of an installation permit shall not exempt any person, equipment or process to whom or for which the permit is issued, from full compliance with the requirements of Articles 1 and 2 of this chapter or from liability to prosecution thereunder.
[R.O. 1966 C.S. § 3:1-33]
Any violation of the provisions of this Article shall be sufficient cause and authority for the Director to stop all work in connection with such installation. The Director is hereby authorized and empowered to seal the installation, and no further work shall be undertaken in connection therewith without the express written approval of the Director after full compliance with the provisions of this Article.
[R.O. 1966 C.S. § 3:1-34]
If the construction, installation or alteration for which a permit has been issued is not commenced within one year of the date of issuance of the permit, or is suspended for more than one year, the permit issued shall be considered automatically cancelled and the fee paid for the permit shall be forfeited.
[R.O. 1966 C.S. § 3:1-35]
a. 
No person shall cause, suffer, allow or permit the use or operation of any new or altered equipment, device or apparatus as described in Section 16:21-40 without having first obtained an operating certificate from the Director permitting such use or operation.
b. 
No operating certificate shall be required for the following:
1. 
Internal combustion engines, and motor vehicles;
2. 
Repairs to previously approved equipment.
[R.O. 1966 C.S. § 3:1-36]
The fee for an operating certificate shall be as prescribed in the schedule of fees set forth in Article 7 of this chapter.
[R.O. 1966 C.S. § 3:1-37]
An operating certificate shall be issued forthwith by the Director after the work for which the installation permit was issued has been inspected and approved by him/her, and the payment of the certificate fees specified in Article 7 of this chapter.
[R.O. 1966 C.S. § 3:1-38]
The operating certificate shall be displayed in a conspicuous place in the immediate vicinity of the premises in which the equipment or apparatus for which the operating certificate was issued is located.
[R.O. 1966 C.S. § 3:1-39]
The issuance of a certificate of operation shall not exempt the person, equipment or process to whom or for which the certificate of operation is issued, from full compliance with the requirements of Articles 1 and 2 of this chapter, or from liability to prosecution thereunder.
[R.O. 1966 C.S. § 3:1-40]
The Director is hereby authorized to seal any equipment or apparatus for which no operating certificate has been issued as required by this chapter.