Fees for Permits and Certificates, Air Pollution Control
Agency
|
Air Jets or Steam Jets
| |||
---|---|---|---|
Permit
|
Certificate
|
Total
| |
In any size boiler or furnace, for each boiler or furnace
|
$2
|
$3
|
$5
|
Square Feet of Direct Radiation
| ||||
---|---|---|---|---|
Steam
|
Hot Water
|
Permit
|
Certificate
|
Total
|
Up to 749
|
Up to 1,124
|
2
|
3
|
5
|
750 to 4,999
|
1,125 to 7,499
|
3.50
|
5.50
|
9
|
5,000 to 20,000
|
7,500 to 30,000
|
4
|
6
|
10
|
Over 20,000
|
Over 30,000
|
8
|
12
|
20
|
Note: For heating boiler with integral gas burner, oil burner
or stoker, the fee will be 1 1/2 times the above fee for boilers.
|
Power Boilers
| |||
---|---|---|---|
Permit
|
Certificate
|
Total
| |
Less than 50 hp each
|
$2
|
$3
|
$5
|
50.1 to 200 hp
|
$4
|
$6
|
$10
|
200.1 to 400 hp
|
$8
|
$12
|
$20
|
400.1 to 700 hp
|
$12
|
$18
|
$30
|
700.1 to 1,000 hp
|
$16
|
$24
|
$40
|
Over 1,000 hp
|
$20
|
$30
|
$50
|
Note: For boilers with integral gas burner, oil burner or stoker,
the fee will be 1 1/2 times the boiler fee.
|
Boiler Furnaces
| |||
---|---|---|---|
Permit
|
Certificate
|
Total
| |
Rebuilding or changing boiler furnace, involving any change
in capacity, combustion space, furnace volume, or in furnace design,
any size boiler, each
|
$2
|
$3
|
$5
|
Warm Air Furnaces
| |||
---|---|---|---|
Permit
|
Certificate
|
Total
| |
Up to 179,760 BTU per hour output
|
$2
|
$3
|
$5
|
179,761 to 1,199,760 per hour output
|
$3.50
|
$5.50
|
$9
|
1,199,761 to 4,800,000 BTU per hour output
|
$7.50
|
$11.50
|
$19
|
Over 4,800,000 BTU per hour output
|
$8
|
$12
|
$20
|
Note: For warm air furnaces with integral gas burner, oil burner,
or stoker the fee will be 1 1/2 times the above fee for warm
air furnace.
|
Furnaces (Other Than Boiler Furnaces)
| |||||||
---|---|---|---|---|---|---|---|
Fee according to size or hourly fuel consumption (See Table)
| |||||||
Cubic Feet of Gas
| |||||||
Grate Surface
|
Pounds of Coal/hr
|
Gallons of Oil/hr
|
Manufactured
|
Natural
|
Permit
|
Certificate
|
Total
|
Up to 10 square feet
|
164
|
15 or less
|
2,251 to 4,500
|
1,126 to 2,500
|
$2
|
$3
|
$5
|
10.1 to 40 square feet
|
165 to 660
|
15.1 to 60
|
4,501 to 18,000
|
2,501 to 9,000
|
$4
|
$6
|
$10
|
40.1 to 80 square feet
|
661 to 1,320
|
60.1 to 120
|
18,001 to 36,000
|
9,001 to 18,000
|
$8
|
$12
|
$20
|
80.1 to 140 square feet
|
1,321 to 2,310
|
120.1 to 210
|
36,001 to 63,000
|
18,001 to 31,500
|
$12
|
$18
|
$30
|
140.1 to 200 square feet
|
2,311 to 3,300
|
210.1 to 300
|
63,001 to 90,000
|
31,501 to 45,000
|
$16
|
$24
|
$40
|
Over 200 square feet
|
Over 3,300
|
Over 300
|
Over 90,000
|
Over 45,000
|
$20
|
$30
|
$50
|
Note: For furnaces with integral gas burners, oil burners and
stokers, the fee is 1 1/2 times the furnace fee. Smoke ovens,
tar kettles, asphalt kettles, bake ovens, coffee roasters, varnish
kettles, according to grate surface of fuel consumption. For charges
see "Furnaces (Other Than Boiler Furnaces)."
|
Oil Burners, Gas Burners, Mechanical Stokers Only
|
---|
(Not part of integral unit, new or used equipment)
|
The fee for each such installation shall be 1/2 the boiler,
furnace, or furnace other than boiler furnace fee. No fee less than
$3.
|
Pulverized Coal Burners
| ||||
---|---|---|---|---|
Lbs. of Coal Per Hour
|
Permit
|
Certificate
|
Total
| |
Less than 50 hp (In Power or Heating Boilers)
|
$2
|
$3
|
$5
| |
50.1 to 200 hp (In Power or Heating Boilers)
|
$3
|
$5
|
$8
| |
200.1 to 400 hp (In Power or Heating Boilers)
|
$4
|
$6
|
$10
| |
400.1 to 700 hp (In Power Boilers)
|
$6
|
$9
|
$15
| |
700.1 to 1,000 hp (In Power Boilers)
|
$8
|
$12
|
$20
| |
Over 1,000 hp (In Power Boilers)
|
$10
|
$15
|
$25
| |
In Furnaces (Other Than Boiler Furnaces)
|
164
|
$2
|
$3
|
$5
|
In Furnaces (Other Than Boiler Furnaces)
|
165 to 660
|
$3
|
$5
|
$8
|
In Furnaces (Other Than Boiler Furnaces)
|
661 to 1,320
|
$4
|
$6
|
$10
|
In Furnaces (Other Than Boiler Furnaces)
|
1,321 to 2,310
|
$6
|
$9
|
$15
|
In Furnaces (Other Than Boiler Furnaces)
|
2,311 to 3,300
|
$8
|
$12
|
$20
|
In Furnaces (Other Than Boiler Furnaces)
|
Over 3,300
|
$10
|
$15
|
$25
|
Water Heaters
| |||
---|---|---|---|
Permit
|
Certificate
|
Total
| |
Less than 155 gals. capacity each
|
$0.50
|
$0.50
|
$1
|
155 to 999 gals. capacity each
|
$0.75
|
$1.25
|
$2
|
1,000 to 2,000 gals. capacity each
|
$1
|
$2
|
$3
|
Over 2,000 gals. capacity each
|
$2
|
$3
|
$5
|
Less than 85 gals. with integral gas burner, oil burner or stoker
each
|
$0.50
|
$0.50
|
$1
|
85 gals. to 155 gals. with integral gas burner, oil burner or
stoker each
|
$0.75
|
$1.25
|
$2
|
156 to 999 gals. with integral gas burner, oil burner or stoker
each
|
$1
|
$2
|
$3
|
1,000 to 2,000 gals. with integral gas burner, oil burner or
stoker each
|
$2
|
$3
|
$5
|
Over 2,000 gals. with integral gas burner, oil burner or stoker
each
|
$3.50
|
$5.50
|
$9
|
Note: The capacity of water heaters shall be considered the
hourly recovery in gallons raised in temperature 100° F. or its
equivalent.
|
Dust Collectors, Washers, Cinder Traps, Bag Filters or Similar
Equipment
| |||
---|---|---|---|
Permit
|
Certificate
|
Total
| |
Up to 5,000 cubic feet per minute, maximum
|
$2
|
$3
|
$5
|
5,001 to 10,000 cubic feet per minute, maximum
|
$6
|
$9
|
$15
|
10,001 to 25,000 cubic feet per minute, maximum
|
$10
|
$15
|
$25
|
25,001 to 50,000 cubic feet per minute, maximum
|
$15
|
$25
|
$40
|
50,001 to 100,000 cubic feet per minute, maximum
|
$20
|
$30
|
$50
|
Over 100,000 cubic feet per minute, maximum
|
$25
|
$50
|
$75
|
Incinerators
| |
---|---|
Basic fee for all incinerators
|
$25
|