[R.O. 1966 C.S. § 3:1-41]
For a permit or certificate of operation as required by Article 6 of this chapter, the City shall receive from the applicant the certain fees and charges as are set forth in the following schedule.
Fees for Permits and Certificates, Air Pollution Control Agency
Air Jets or Steam Jets
Permit
Certificate
Total
In any size boiler or furnace, for each boiler or furnace
$2
$3
$5
Square Feet of Direct Radiation
Steam
Hot Water
Permit
Certificate
Total
Up to 749
Up to 1,124
2
3
5
750 to 4,999
1,125 to 7,499
3.50
5.50
9
5,000 to 20,000
7,500 to 30,000
4
6
10
Over 20,000
Over 30,000
8
12
20
Note: For heating boiler with integral gas burner, oil burner or stoker, the fee will be 1 1/2 times the above fee for boilers.
Power Boilers
Permit
Certificate
Total
Less than 50 hp each
$2
$3
$5
50.1 to 200 hp
$4
$6
$10
200.1 to 400 hp
$8
$12
$20
400.1 to 700 hp
$12
$18
$30
700.1 to 1,000 hp
$16
$24
$40
Over 1,000 hp
$20
$30
$50
Note: For boilers with integral gas burner, oil burner or stoker, the fee will be 1 1/2 times the boiler fee.
Boiler Furnaces
Permit
Certificate
Total
Rebuilding or changing boiler furnace, involving any change in capacity, combustion space, furnace volume, or in furnace design, any size boiler, each
$2
$3
$5
Warm Air Furnaces
Permit
Certificate
Total
Up to 179,760 BTU per hour output
$2
$3
$5
179,761 to 1,199,760 per hour output
$3.50
$5.50
$9
1,199,761 to 4,800,000 BTU per hour output
$7.50
$11.50
$19
Over 4,800,000 BTU per hour output
$8
$12
$20
Note: For warm air furnaces with integral gas burner, oil burner, or stoker the fee will be 1 1/2 times the above fee for warm air furnace.
Furnaces (Other Than Boiler Furnaces)
Fee according to size or hourly fuel consumption (See Table)
Cubic Feet of Gas
Grate Surface
Pounds of Coal/hr
Gallons of Oil/hr
Manufactured
Natural
Permit
Certificate
Total
Up to 10 square feet
164
15 or less
2,251 to 4,500
1,126 to 2,500
$2
$3
$5
10.1 to 40 square feet
165 to 660
15.1 to 60
4,501 to 18,000
2,501 to 9,000
$4
$6
$10
40.1 to 80 square feet
661 to 1,320
60.1 to 120
18,001 to 36,000
9,001 to 18,000
$8
$12
$20
80.1 to 140 square feet
1,321 to 2,310
120.1 to 210
36,001 to 63,000
18,001 to 31,500
$12
$18
$30
140.1 to 200 square feet
2,311 to 3,300
210.1 to 300
63,001 to 90,000
31,501 to 45,000
$16
$24
$40
Over 200 square feet
Over 3,300
Over 300
Over 90,000
Over 45,000
$20
$30
$50
Note: For furnaces with integral gas burners, oil burners and stokers, the fee is 1 1/2 times the furnace fee. Smoke ovens, tar kettles, asphalt kettles, bake ovens, coffee roasters, varnish kettles, according to grate surface of fuel consumption. For charges see "Furnaces (Other Than Boiler Furnaces)."
Oil Burners, Gas Burners, Mechanical Stokers Only
(Not part of integral unit, new or used equipment)
The fee for each such installation shall be 1/2 the boiler, furnace, or furnace other than boiler furnace fee. No fee less than $3.
Pulverized Coal Burners
Lbs. of Coal Per Hour
Permit
Certificate
Total
Less than 50 hp (In Power or Heating Boilers)
$2
$3
$5
50.1 to 200 hp (In Power or Heating Boilers)
$3
$5
$8
200.1 to 400 hp (In Power or Heating Boilers)
$4
$6
$10
400.1 to 700 hp (In Power Boilers)
$6
$9
$15
700.1 to 1,000 hp (In Power Boilers)
$8
$12
$20
Over 1,000 hp (In Power Boilers)
$10
$15
$25
In Furnaces (Other Than Boiler Furnaces)
164
$2
$3
$5
In Furnaces (Other Than Boiler Furnaces)
165 to 660
$3
$5
$8
In Furnaces (Other Than Boiler Furnaces)
661 to 1,320
$4
$6
$10
In Furnaces (Other Than Boiler Furnaces)
1,321 to 2,310
$6
$9
$15
In Furnaces (Other Than Boiler Furnaces)
2,311 to 3,300
$8
$12
$20
In Furnaces (Other Than Boiler Furnaces)
Over 3,300
$10
$15
$25
Water Heaters
Permit
Certificate
Total
Less than 155 gals. capacity each
$0.50
$0.50
$1
155 to 999 gals. capacity each
$0.75
$1.25
$2
1,000 to 2,000 gals. capacity each
$1
$2
$3
Over 2,000 gals. capacity each
$2
$3
$5
Less than 85 gals. with integral gas burner, oil burner or stoker each
$0.50
$0.50
$1
85 gals. to 155 gals. with integral gas burner, oil burner or stoker each
$0.75
$1.25
$2
156 to 999 gals. with integral gas burner, oil burner or stoker each
$1
$2
$3
1,000 to 2,000 gals. with integral gas burner, oil burner or stoker each
$2
$3
$5
Over 2,000 gals. with integral gas burner, oil burner or stoker each
$3.50
$5.50
$9
Note: The capacity of water heaters shall be considered the hourly recovery in gallons raised in temperature 100° F. or its equivalent.
Dust Collectors, Washers, Cinder Traps, Bag Filters or Similar Equipment
Permit
Certificate
Total
Up to 5,000 cubic feet per minute, maximum
$2
$3
$5
5,001 to 10,000 cubic feet per minute, maximum
$6
$9
$15
10,001 to 25,000 cubic feet per minute, maximum
$10
$15
$25
25,001 to 50,000 cubic feet per minute, maximum
$15
$25
$40
50,001 to 100,000 cubic feet per minute, maximum
$20
$30
$50
Over 100,000 cubic feet per minute, maximum
$25
$50
$75
Incinerators
Basic fee for all incinerators
$25
[R.O. 1966 C.S. § 3:1-43]
For a permit and for certificate of operation of any equipment, device, apparatus, or contrivance which is not included in the schedule in Section 16:21-55, the City shall receive from the applicant such fees and charges as are set by the Director; provided, however, that the total fee for each unit of equipment, device, apparatus or contrivance shall not exceed the sum of $25.